My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2019 Council Packet
Orono
>
City Council
>
2019
>
04-08-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 12:03:49 PM
Creation date
5/22/2019 11:59:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. ________________________ <br /> <br />Page 3 of 6 <br />covenants over Outlot A. Developer shall provide copies of approved Hennepin County <br />permit for driveway access location for Outlot A. <br /> <br />3) Trail Easement. An easement for public trail purposes shall be granted by the Developer <br />over the easterly 10 feet of the plat. <br /> <br />4) Municipal Sewer and Water. The subject property is located within the Metropolitan Urban <br />Service Area (MUSA). Sewer and water service is available to the property in Shadywood <br />Road. Both Lots 1 and 2 shall make connections to the existing sewer and water mains in <br />Shadywood Road. This plat proposal will be submitted to the Fire Chief/Fire Marshal for <br />review of whether the remoteness of the building site for Lot 1 will require installation of a <br />new hydrant within the property. If a hydrant is required, the developer shall be responsible <br />for the costs of installation of said hydrant. <br /> <br />5) City Utility Connection Charges. The property was fully assessed for sanitary sewer as part <br />of the 1963-1A sewer projects based on front footage and acreage. The property was charged <br />for only one unit as part of the 1970-LW-1 project. A second water unit connection charge <br />will be due prior to Final Plat approval in the amount of $4,240 (2019 Fee Schedule). <br /> <br />6) Metropolitan Council Sewer Availability Charge (SAC). Met Council SAC charges for <br />both lots will be due at the time of building permit for each respective lot. <br /> <br />7) Stormwater and Drainage Improvements. Final plat approval is subject to Minnehaha <br />Creek Watershed District (MCWD) approval and permits as required. Final plat approval <br />shall not be granted until the Developer has provided evidence that all required MCWD <br />permits have been obtained. Upon building permit issuance the property owner will be <br />required to comply with individual lot stormwater and erosion control management practices. <br /> <br />8) Drainage and Utility Easements. On the final plat, Drainage and Utility Easements shall <br />be dedicated to the public 10' along all exterior property lines, and 5' either side of interior <br />property lines, except such easements shall be increased to accommodate drainage where <br />required, subject to City staff approval. A Drainage and Utility easement shall be granted <br />over the entirety of Outlot A. Drainage Easements shall be granted over any stormwater <br />facilities that may be required by the Minnehaha Creek Watershed District. <br /> <br />9) Development Fees. <br /> <br />A. Park Dedication Fee. The subdivision is subject to the standard Park Dedication Fee <br />requirement. Because the value of newly created Lot 1 is expected to be in excess of the <br />threshold value of $69,375.00, the 8% park fee cap of $5,550 per new lot will apply. A Park <br />Dedication Fee will be due for 1 lot, in the amount of $5,550. (2019 fee schedule) <br /> <br />B. Stormwater and Drainage Trunk Fee. The development is subject to the Stormwater and <br />Drainage Trunk Fee, established in the 2013 Fee Schedule and revised in 2018, of $3,025.00
The URL can be used to link to this page
Your browser does not support the video tag.