My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2019 Council Packet
Orono
>
City Council
>
2019
>
04-08-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 12:03:49 PM
Creation date
5/22/2019 11:59:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br />a <br />k <br />e <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />M <br />i <br />n <br />n <br />e <br />t <br />o <br />n <br />k <br />a <br />P <br />h <br />e <br />a <br />s <br />a <br />n <br />t <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />R <br />o <br />a <br />d <br />S <br />1 <br />M <br />i <br />n <br />n <br />e <br />t <br />o <br />n <br />k <br />a <br />, <br /> <br />M <br />i <br />n <br />n <br />e <br />s <br />o <br />t <br />a <br /> <br /> <br />5 <br />5 <br />3 <br />4 <br />5 <br />P <br />h <br />o <br />n <br />e <br /> <br />( <br />9 <br />5 <br />2 <br />) <br /> <br />4 <br />7 <br />4 <br />- <br />7 <br />9 <br />6 <br />4 <br />1 <br />7 <br />9 <br />1 <br />7 <br /> <br />H <br />i <br />g <br />h <br />w <br />a <br />y <br /> <br />7 <br />W <br />e <br />b <br />: <br /> <br />w <br />w <br />w <br />. <br />a <br />d <br />v <br />s <br />u <br />r <br />. <br />c <br />o <br />m <br />S <br />H <br />E <br />E <br />T <br /> <br />1 <br /> <br />O <br />F <br /> <br />1 <br />40200 LEGAL DESCRIPTION:Lot 12, PHEASANT LAWN, Hennepin County, Minnesota.LOT AREA = 31,342 SQUARE FEETSCOPE OF WORK & LIMITATIONS:1.Showing the length and direction of boundary lines of the legal description listed above. The scope of our servic <br />e <br />s <br /> <br />d <br />o <br />e <br />s <br /> <br />n <br />o <br />t <br /> <br />i <br />n <br />c <br />l <br />u <br />d <br />e <br />determining what you own, which is a legal matter. Please check the legal description with your records or consult <br />w <br />i <br />t <br />h <br /> <br />c <br />o <br />m <br />p <br />e <br />t <br />e <br />n <br />t <br /> <br />l <br />e <br />g <br />a <br />l <br />counsel, if necessary, to make sure that it is correct and that any matters of record, such as easements, that you wish t <br />o <br /> <br />b <br />e <br /> <br />i <br />n <br />c <br />l <br />u <br />d <br />e <br />d <br /> <br />o <br />n <br /> <br />t <br />h <br />e <br />survey have been shown.2.Showing the location of observed existing improvements we deem necessary for the survey.3.Setting survey markers or verifying existing survey markers to establish the corners of the property.4.Showing elevations on the site at selected locations to give some indication of the topography of the site. We h <br />a <br />v <br />e <br /> <br />a <br />l <br />s <br />o <br /> <br />p <br />r <br />o <br />v <br />i <br />d <br />e <br />d <br /> <br />a <br />benchmark for your use in determining elevations for construction on this site. The elevations shown relate only to the <br />b <br />e <br />n <br />c <br />h <br />m <br />a <br />r <br />k <br /> <br />p <br />r <br />o <br />v <br />i <br />d <br />e <br />d <br />on this survey. Use that benchmark and check at least one other feature shown on the survey when determining other e <br />l <br />e <br />v <br />a <br />t <br />i <br />o <br />n <br />s <br /> <br />f <br />o <br />r <br /> <br />u <br />s <br />e <br /> <br />o <br />n <br />this site or before beginning construction.5.This survey has been completed without the benefit of a current title commitment. There may be existing easements or <br />o <br />t <br />h <br />e <br />r <br /> <br />e <br />n <br />c <br />u <br />m <br />b <br />r <br />a <br />n <br />c <br />e <br />s <br />that would be revealed by a current title commitment. Therefore, this survey does not purport to show any easements or <br />e <br />n <br />c <br />u <br />m <br />b <br />r <br />a <br />n <br />c <br />e <br />s <br /> <br />o <br />t <br />h <br />e <br />r <br />than the ones shown hereon.6.Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding and or stucc <br />o <br /> <br />o <br />f <br /> <br />t <br />h <br />e <br /> <br />b <br />u <br />i <br />l <br />d <br />i <br />n <br />g <br />. <br />7.While we show a proposed location for this home or addition, we are not as familiar with your proposed plans as you, y <br />o <br />u <br />r <br /> <br />a <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />, <br /> <br />o <br />r <br /> <br />t <br />h <br />e <br />builder are. Review our proposed location of the improvements and proposed yard grades carefully to verify that th <br />e <br />y <br /> <br />m <br />a <br />t <br />c <br />h <br /> <br />y <br />o <br />u <br />r <br /> <br />p <br />l <br />a <br />n <br />s <br />before construction begins. Also, we are not as familiar with local codes and minimum requirements as the local <br />b <br />u <br />i <br />l <br />d <br />i <br />n <br />g <br /> <br />a <br />n <br />d <br /> <br />z <br />o <br />n <br />i <br />n <br />g <br />officials in this community are. Be sure to show this survey to said officials, or any other officials that may have j <br />u <br />r <br />i <br />s <br />d <br />i <br />c <br />t <br />i <br />o <br />n <br /> <br />o <br />v <br />e <br />r <br /> <br />t <br />h <br />e <br />proposed improvements and obtain their approvals before beginning construction or planning improvements to the prope <br />r <br />t <br />y <br />. <br />8.While we show the building setback lines per the City of Orono web site, we suggest you show this survey to the approp <br />r <br />i <br />a <br />t <br />e <br /> <br />c <br />i <br />t <br />y <br /> <br />o <br />f <br />f <br />i <br />c <br />i <br />a <br />l <br />s <br /> <br />t <br />o <br />be sure that the setback lines are shown correctly. Do this BEFORE you use this survey to design anything for this site.STANDARD SYMBOLS & CONVENTIONS:"භ" Denotes iron survey marker, set, unless otherwise noted. <br /># <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br />N <br />O <br />. <br />D <br />A <br />T <br />E <br />F <br />E <br />B <br />R <br />U <br />A <br />R <br />Y <br /> <br />1 <br />5 <br />, <br /> <br />2 <br />0 <br />1 <br />9 <br />D <br />A <br />T <br />E <br /> <br />D <br />R <br />A <br />F <br />T <br />E <br />D <br />: <br />F <br />E <br />B <br />R <br />U <br />A <br />R <br />Y <br /> <br />1 <br />5 <br />, <br /> <br />2 <br />0 <br />1 <br />9 <br /># <br /> <br />5 <br />2 <br />7 <br />1 <br />6 <br />J <br />o <br />s <br />h <br />u <br />a <br /> <br />S <br />. <br /> <br />R <br />i <br />n <br />k <br />e <br />D <br />E <br />C <br />. <br /> <br />7 <br />, <br /> <br />2 <br />0 <br />1 <br />8 <br />D <br />A <br />T <br />E <br /> <br />S <br />U <br />R <br />V <br />E <br />Y <br />E <br />D <br />: <br />S <br />U <br />R <br />V <br />E <br />Y <br />E <br />D <br /> <br />B <br />Y <br />A <br />D <br />V <br />A <br />N <br />C <br />E <br />D <br /> <br />S <br />U <br />R <br />V <br />E <br />Y <br />I <br />N <br />G <br />. <br /> <br />& <br /> <br />E <br />N <br />G <br />. <br />, <br /> <br />C <br />O <br />. <br />GRADING & EROSION CONTROL NOTES:BEFORE DEMOLITION AND GRADING BEGINxInstall silt fence/bio roll around the perimeter of the construction area.xSediment control measures must remain in place until final stabilization has beenestablished and then shall be removed. Sediment controls may be removed toaccommodate short term construction activity but must be replaced before the nextrain.xA temporary rock construction entrance shall be established at each access point tothe site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from thestreet into the site and shall be underlain with permeable geotextile fabric. Theentrance shall be maintained during construction by top dressing or washing toprevent tracking or flow of sediments onto public streets, walks or alleys. Potentialentrances that are not so protected shall be closed by fencing to prevent unprotectedexit from the site.xContractor shall install inlet protection on all existing storm sewer inlets inaccordance with the city standard details. Inlet protection shall also be provided onall proposed storm sewer inlets immediately following construction of the inlet.Inlet protection must be installed in a manner that will not impound water forextended periods of time or in a manner that presents a hazard to vehicular orpedestrian traffic.DURING CONSTRUCTION:xWhen dirt stockpiles have been created, a double row of silt fence shall be placed toprevent escape of sediment laden runoff and if the piles or other disturbed areas areto remain in place for more than 14 days, they shall be seeded with MinnesotaDepartment of Transportation Seed Mixture 22-111 at 100 lb/acre followed bycovering with spray mulch.xA dumpster shall be placed on the site for prompt disposal of construction debris.These dumpsters shall be serviced regularly to prevent overflowing and blowingonto adjacent properties. Disposal of solid wastes from the site shall in accordancewith Minnesota Pollution Control Agency requirements.xA separate container shall be placed for disposal of hazardous waste. Hazardouswastes shall be disposed of in accordance with MPCA requirements.xConcrete truck washout shall be in the plastic lined ditch and dispose of washings assolid waste.xSediment control devices shall be regularly inspected and after major rainfall event <br />s <br />and shall be cleaned and repaired as necessary to provide downstream protection.xStreets and other public ways shall be inspected daily and if litter or soils has beendeposited it shall promptly be removed.xIf necessary, vehicles, that have mud on their wheels, shall be cleaned before exiti <br />n <br />g <br />the site in the rock entrance areasxMoisture shall be applied to disturbed areas to control dust as needed.xPortable toilet facilities shall be placed on site for use by workers and shall beproperly maintained.xIf it becomes necessary to pump the excavation during construction, pump dischar <br />g <br />e <br />shall be into the stockpile areas so that the double silt fence around these areas canfilter the water before it leaves the site.xTemporary erosion control shall be installed no later than 14 days after the site isfirst disturbed and shall consist of broadcast seeding with Minnesota Department o <br />f <br />Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spra <br />y <br />mulch.xErosion control measures shown on the erosion control plan are the absoluteminimum. The contractor shall install temporary earth dikes, sediment traps orbasins and additional silt fencing as deemed necessary to control erosion.SITE WORK COMPLETION:x:KHQILQDOJUDGLQJKDVEHHQFRPSOHWHGEXWEHIRUHSODFHPHQWRIVHHGRUVRGDQ³DVEXLOW´VXUYH\VKDOOEHGRQHSHU City of Orono requirements to insure that gradingwas properly done.xWhen any remedial grading has been completed, sod or seeding shall be complete <br />d <br />including any erosion control blankets for steep areas.xWhen turf is established, silt fence and inlet protection and other erosion controldevices shall be disposed of and adjacent streets, alleys and walks shall be cleanedas needed to deliver a site that is erosion resistant and clean.xContractor shall maintain positive drainage of a minimum 2% slope away fromproposed building.
The URL can be used to link to this page
Your browser does not support the video tag.