My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2019 Council Packet
Orono
>
City Council
>
2019
>
04-08-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 12:03:49 PM
Creation date
5/22/2019 11:59:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Prepared By: SO & Reviewed By: Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain approval to proceed with roofing replacement on <br />the Navarre Water Plant. <br /> <br />2. Background. The Navarre water plant developed a leak over the softener apparatus this winter. <br />Upon further inspection of the roof it was determined that three quarters of the roof was near failure and <br />the most cost effective option at his point would be to replace the rood. The rubber membrane is well <br />beyond its useful life and the roof is beginning to lose its shape. <br /> <br />3. Project Scope. The project will consist of the removal of the existing membrane, roofing insulation, <br />sheet metal coping, and any rotten plywood. Then new plywood, insulation and membrane will be <br />installed with perimeter flashing. <br /> <br />4. Cost. The City received a two quotes of from the lowest quote was from Allweather roof for <br />$32,500. <br /> <br />Contractor Quote <br />Allweather Roof $ 32,500 <br />Mint Roofing $ 48,950 <br /> <br />5. Funding. This project will be funded by the Water Fund. The Fund has Projected 2019 year-end <br />balance of $215,890. <br /> <br />6. Staff Recommendation. I recommend that the city council authorize the replacement of the Navarre <br />Water plant. <br /> <br />COUNCIL ACTION REQUESTED <br /> <br />Motion to authorize All Weather to replace the Navarre Water plant for $32,500. <br /> <br /> <br /> <br /> <br />Item No.: 9 Date: April 8, 2019 <br />Item Description: Navarre Water Plant Roof Replacement <br />Presenter: Scott Oberaigner, <br />Public Works Supervisor <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.