Laserfiche WebLink
Wayzata Boulevard reconstruction Shoreline Drive and Shadywood Road intersection improvements <br />Typical construction process <br />1 Pavement removal <br />5 Curb and gutter installation <br />2 Storm sewer replacement <br />6 Asphalt paving <br />3 Watermain replacement <br />7 Sidewalk and trail replacement <br />4 Soil replacement and grading <br />8 Final paving and striping <br />32-225-01-19_CR_15-19_ShorelineDr-ShadywoodRd_boards_36x24in_V3.indd 4 2/25/19 11:49 AM