My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2019 Council Packet
Orono
>
City Council
>
2019
>
05-13-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 10:18:28 AM
Creation date
5/22/2019 10:11:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 03/20/19 <br />Date Application Considered as Complete: 03/20/19 <br />60-Day Review Period Expires: 05/19/19 <br /> <br /> <br />To: Chair Thiesse and Planning Commission Members <br /> Dustin Rief, City Administrator <br /> <br />From: Melanie Curtis, Planner mcc <br /> <br />Date: 15 April 2019 <br /> <br />Subject: #LA19-000024, Streeter & Associates o/b/o Peter & Nicole Thomas <br />1385 Orono Lane, <br />Variances <br />Public Hearing <br /> <br /> <br />Background <br />The home on the property was originally built in 1927 and is almost entirely within the 75-foot <br />setback from the lake. The existing lakeside patio was constructed over a basement level well <br />room; the cap to the well room is leaking and the owner needs to repair the area. Since the <br />existing patio needs to be removed to conduct the repairs, the applicant proposes a <br />reconfiguration of the patio to add landings under new lake side doors, within the required lake <br />yard; a variance is necessary. The existing hardcover level will be reduced. <br /> <br />*Please see the applicant’s reconciliation of the hardcover percentage inconsistencies between <br />the 2002 and 2019 surveys. The lot area discrepancy between the two surveys is not <br />uncommon, however it is noteworthy that the hardcover square footage is consistent. <br /> <br />Planned improvements include a reconfiguration of the patio, addition of two gravel areas <br />within a bluestone edging. The gravel is not considered hardcover. <br /> <br />LOT ANALYSIS WORKSHEET <br /> <br />Section 78-305 - Setbacks: <br />LR-1A Required Existing Proposed <br />Street/Rear 50’ 116.8’ No Change <br />West Side 30’ 65’ No Change <br />Lakeshore 75’ House 52.3’ <br />Patio 43’ <br />House – No Change <br />Patio – No Change <br />Average Lakeshore <br />The average lakeshore setback for this property is set by a line <br />drawn between the adjacent homes at 1387 Orono Lane and <br />1380 Orono Lane. The entire home on the subject property is <br />situated lakeward of the average lakeshore setback line. <br /> <br />Application Summary: The applicant is requesting variances to rebuild an existing patio and <br />add new stoops within the 75-foot setback. <br />Staff Recommendation: Planning Commission should evaluate the practical difficulties and <br />make a recommendation..
The URL can be used to link to this page
Your browser does not support the video tag.