My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2019 Council Packet
Orono
>
City Council
>
2019
>
05-13-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 10:18:28 AM
Creation date
5/22/2019 10:11:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
435
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 03/20/19 <br />Date Application Considered as Complete: 03/20/19 <br />60-Day Review Period Expires: 05/19/19 <br /> <br /> <br />To: Chair Thiesse and Planning Commission Members <br /> Dustin Rief, City Administrator <br /> <br />From: Melanie Curtis, Planner mcc <br /> <br />Date: 15 April 2019 <br /> <br />Subject: #LA19-000023, Nor-Son Custom Builders o/b/o Charles & Jill Miller, <br />1600 Bohns Point Road, <br />IUP – Export 500+ cubic yards of material <br />Public Hearing <br /> <br /> <br />Background <br />A new home is proposed at 1600 Bohns Point Road. The project will involve the export of <br />approximately 1,300 cubic yards of material from the site; an interim use permit (IUP) is <br />required. <br /> <br />Section 78- 330 - Lot Area/Width: <br /> <br />LR-1B Lot Area Lot Width <br />Required 43,560 s.f. (1.0 acres) 140’ <br />Actual 54,802 s.f. (1.25 acre) 200’ @ 75’ / 177’ @ OHWL <br /> <br />Applicable Regulations: <br />Interim Use Permit (Code Section 78-1726(a)(6)) <br />The construction of the new home will result in 1,300 cubic yards of unneeded material. The <br />applicant proposes to export this from the site; the destination will not be within the City. The <br />proposed home will not be out of character with the neighborhood. <br />Applicable Regulation: Interim Use Permit (Section 78-1726) <br /> <br />The Planning Commission may recommend and the Council may grant an Interim Use Permit <br />(IUP). On the basis of the application and the evidence submitted, the city council <br />determines that the use will comply with the following: <br />1) The use will meet the general performance standards in section 78-916 of this chapter; <br />the proposed grading will conform to the standards within Section 78-916 of the Zoning <br />Code. <br />Application Summary: The applicant is requesting an interim use permit to export <br />approximately 1,300 cubic yards of material in conjunction with construction of a new <br />residence. <br />Staff Recommendation: Planning Department Staff recommends approval with conditions.
The URL can be used to link to this page
Your browser does not support the video tag.