Laserfiche WebLink
ASPHALT-2008 Carlson Estate ( 7-14-08) <br /> Note: This Proposal Response must be fully filled out or your bid will be rejected. LUMP SUM <br /> BASE BID for furnishing labor,materials,equipment and services necessary for and incidental <br /> to Asphalt, Carlson Estate, Orano,MN., stated in the Specifications, Other Requirements and <br /> Drawings Cl and C2 dated 7-14-08. <br /> LUMP SUM BASE BID TOTAL FOR ASPHALT AND RELATED WORK: <br /> LUMP SUM ALTERNATE BID TOTAL FOR ASPHALT AND RELATED WORK: <br /> UNIT PRICE NO. 1: $/Ton to furnish and install extra Class 5 sub-base: $ <br /> UNIT PRICE NO. 2: $/Yard for extra excavation: $ <br /> UNIT PRICE NO. 3: $/Ton for furnishing and installing extra asphalt: $ <br /> I have reviewed addendums for this project. <br /> Submitted with authorization and in good faith and signed by: <br /> Name (Authorized Signature) Date <br /> Title <br />