My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004268 - demo
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0525 Tonkawa Road - 06-117-23-41-0098
>
Permits/Inspections
>
1992-004268 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:15:31 PM
Creation date
5/21/2019 1:44:20 PM
Metadata
Fields
Template:
x Address Old
Address
0525 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0611723410098
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4,Z fid' <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (1335 So Brown Rd) <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. burning, well <br /> 2. Work must not begin unless the permit card is available on the job <br /> site. <br /> 3. A 24 hour notice is required for all inspections. Call 473-7357. <br /> JOB SITE ADDRESS: 5_,.Z5_ IC/r/.-4 40 k /�J <br /> Occupancy Type: Residential Commercial <br /> OWNER'S NAME: ��/��r/� /�. i��� r �Qr Phone: <br /> Mailing Address: 9�0 -�lG,7!-� C,�ess hr City: ;H.v���+ ,sf <br /> CONTRACTOR'S NAME: Z/// Bus. No. : <br /> Mailing Address: /Sc ZZ2 Qv/ City: <br /> Demolition if planned by means of: _manual disassembly Meavy equipment <br /> burning (by fire department) <br /> Permits Issued: <br /> # Burning Fire Department <br /> # Well Abandonment !U ,d/ �- <br /> In return for issuance of said Demolition Permit, the undersigned owner <br /> hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time <br /> as demolition is complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the <br /> public rights-of-way unless specific prior approval is obtained in <br /> writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in <br /> accordance with all applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health <br /> Department regulations. <br /> 6. Inspection required when all debris has been removed, before <br /> backfilling. <br /> 7. Within 5 working days of superstructure removal , a final inspection <br /> shall be requested. The site shall be left clean and clear of all <br /> debris, with any excavation filled with earth level with the adjacent <br /> ground elevation (except when such excavation is to be used as part of <br /> a new building and such new building is actually under construction). <br />
The URL can be used to link to this page
Your browser does not support the video tag.