Laserfiche WebLink
DEMOLITION KEY NOTES & GENERAL NOTES: <br /> 1.Remove Carpeting-this room <br /> 2.Remove Door and casing.Verify if door framing can be saved. <br /> 3.Remove all texture at ceiling <br /> 4.Remove all appliances.Verify with Owner's representative if any are to be saved <br /> 5.Remove Lower Cabinet and extra burners,stainless steel back splash <br /> 6.Remove Sink and Plastic Laminate Countertop <br /> 7.Remove Ceiling at kitchen _ <br /> 8.Remove countertop and backsplash <br /> 10.Remove shelves in pantry <br /> 11.Remove Cabinet in Stair Hall <br /> 12.See Room finish schedule for rooms to have wallpaper removed. <br /> 13.Remove entire exterior deck assembly and footings.Retain footing holes for possible reuse. <br /> 14.Direct all questions concerning extent of demolition to architect.Do not proceed with demolition in case of questions. <br /> 15.Remove areas demarcated by dashed lines. 7 <br /> 16.See Main Level Architectural plan for areas of new construction.Contractor to coordinate between demo and new construction. <br /> 2 1 1 4 6 4 5 10 11 <br /> wu <br /> - <br /> - ---- --------- <br /> k- <br /> 7 <br /> ------- -------- ------------ <br /> LA <br /> --------------- <br /> 9 <br /> 1 <br /> 8 <br /> 13 <br /> 'L - - - - - - - - - - - - - ' <br /> L - -- - -- -- - - - - - -- - - - - - <br /> Main Floor Demo Plan <br /> Issued for Permit Only on 9/27/99 <br /> Scale= N.T.S.: Issued for Construction on <br /> Telep 37,.s,ssIEEE Drawn by TPH: D2 <br /> Facsimile 371.9199 <br />