Laserfiche WebLink
ANTI-SIPHON FOUR SETS OF BATTER BOARDS SHOULD BE USED <br /> OVERLAP IS TO MARK LOCATION OF A RECTANGULAR BUILDING ON I� <br /> DRAIN CHANNEL 36"='7iO COVERAGE WIDTH "SHORT" OF THE SITE. THE FINISH GRADE FOR THE SITE BATTER BOARD W <br /> 12" PITCH FLAT TO AROUND THE PERIMETER MUST BE ESTABLISHED AT 1 0 p <br /> STIFFEN THIS TIME. SAW KERF p <br /> PURLIN EDGE SET BATTER BOARDS AT LEAST 4 FT. AWAY FROM I <br /> BEARING 150 RIDGE CAP 170 FASCIA TRIM EACH CORNER. ONCE AGAIN, DOUBLE CHECK THE STAKE <br /> EXTRA LEG 126 LONG 16" WIDE # 122" LONG DIAGONALS FOR SQUARE. PLUMB 00 <br /> _ NAIL B ui <br /> m <br /> MATERIAL: .016 THICK GALVANIZED STEEL, <br /> ;STAKE, < 4APAINTED, GRADE E TOP PANEL ANTI-SIPHON J� P� 71` 00 <br /> 80 KSI MINIMUM YIELD SO pJDRAIN CHANNEL dw O�Eq, 1 -0" 0~12" PURLIN �O' — LTAUT LINE <br /> BEARINGjo #190 BOTTOM CLOSURE #210 TRACK COVER <br /> 3" 3" EXTRA LEG BTM PANEL 122" LONG 122" LONG / OUTSIDE OF FOUNDATION <br /> WALLDIAGONAL <br /> \ O <br /> m <br /> 7/8" SID E�A P OG ky / BE EQ ONS MUST USING THE 3-4-5 SYSTEM TO CHECK THE CORNERS Y <br /> 0710 fly BE EQUAL!! OF THE BUILDING. THIS IS IS MAKE SURE THE 00 <br /> 3/16" .p OV BUILDING O SQUARE. IN THIS DRAWING, A <br /> MULTIPLE OF 3,4,5 WAS USED. THREE UNITS <br /> OGN <br /> OF 0 OF EACH: 3X3=9, 4X3=12,AND 5X3=15.� c <br /> #230 "Z" TRIM #250"J" TRIM SON ALM (FULL DIAGONALS OF THE TOTAL BUILDING IS MORE ACCURATE)-rim q <br /> TMcovERAGE zz LONG ,2LONG <br /> NPoPor BOARDS <br /> , EF020 _384s4 <br /> - e NESECTIONN SPECS .s Eo SITE PREPARATIONR1 <br /> PRE-DRILL HOLE INTO <br /> COLUMN— <br /> OLUMN COLUMN & INSERT SHARP TOP VIEW 2X4 STAKE <br /> EDGE INTO HOLE 3/8" DIA. RIGHT <br /> x21/4" DEEP. -------------------------- CORNER COLUMNS <br /> (z) z ,/r x SIDEWALL <br /> 6 GA. STAPLES INTO 2X6-10' BRACE #270 TRACK BOARD COVER #290 SLOG. DR. JAMB TRIM LESTER CORNER COLUMNS WILL VARY WITH THE TYPE OF <br /> COLUMN TO HOLD ANCHOR MATERIAL OUTSIDE OF 12r LONG 122" LONG UNI-FRAME BUILDING BOUGHT BY THE DEALER. <br /> SET IN PLACE BUILDING 2-PLY (WITH #0 OR #1 SIDEWALL COLUMNS) <br /> STANDARD ANCHOR 2X8 CORNER COLUMNS <br /> SET FASTENING I 2X6 CORNER COLUMNS I A UNI-FRAME II BUILDING (WHERE THE COLUMNS ARE BOLTED TO <br /> __ _ 2X6-10' BRACE IJ J1 <br /> A CONCRETE FOUNDATION) HAS FACTORY BUILT COLUMNS. j <br /> r CORNER COLUMN MATERIAL 1< FINGER-JOINT <1 ON A STANDARD RECTANGULAR BUILDING, THERE WILL BE TWO <br /> ANCHOR RODS AT 90 Ip of CORNER "LEFT' AND TWO CORNER "RIGHT" COLUMNS PROVIDED. a 7 <br /> CORNERS AND OPENINGS G 1w 2X8 CORNER COLUMNS WI u X <br /> 11 2X4 STAKE #510 (7') JAMB TRIM #550 (8 1/2") JAMB TRIM I 2X6 CORNER COLUMNS 1 THERE WILL ALSO BE LEFT AND RIGHT CORNER COLUMNS SHIPPED U * <br /> 11 122" LONG 122' LONG 3-PLY (WITH #2, #D1 OR #D2 WITH THE ONE-PIECE EMBEDDED UNI-FRAME I BUILDING. X <br /> USING A 2' LENGTH OF 3/4" PIPE, SLIP ISOMETRIC VIEW II SIDEWALL COLUMNS) m 0 <br /> HOOK OF ANCHOR ROD INTO PIPE AND TWIST <br /> ROD SO IT WILL SET AT 90 DEGREES FROM CORNER COLUMN NOTE: RIGHT AND LEFT IS DETERMINED BY LOOKING AT THE <br /> WHERE IT WAS. HOOK CAN NOW BE FASTENED SIDEWALL BUILDING FROM THE OUTSIDE FACING A SIDEWALL, <br /> TO INSIDE OF COLUMN AWAY FROM JAMB OR L ---------------------- RIGHT <br /> SPLASHPLANK. THIS ELIMINATES ONE-PIECE UNI-FRAME I <br /> MORTISING OF COLUMN. #820 RAKE AND CORNER TRIM <br /> PRE-CAST OR POURED FOOTING 2X6-10' BRACE 13'/15'/17'/19'/21'/23' LG. #890 68" LONG SIDE JAMB TRIM AND UNI-FRAME II BUILDINGS U <br /> MATERIAL Z Z <br /> EF180 STANDARD,ROD OPENINGS.COLUMN <br /> UNI-FRAMEC CORNERS <br /> RI 2X6-10' BRACE DE095 STANDARDCOMMON METAL TRIM METAL FLASHINGS IDENTIFICATIONS CORNER <br /> PRE FF01 1 UM PR CONE-PC COL / UNI-FR III IF RR1N LAYOUT LEFT RIGHT � Z V r0) <br /> MATERIAL <br /> SINGLE PLY TRUSS >o n <br /> CORNER COLUMN 3 - 16d NAILS (2) - 16d NAILS FOR ALL V)w Z <br /> EACH CONNECTION BUILDING HEIGHTS (AT EACH CONNECTION TO �� yd J2 <br /> TEMPORARY BRACE CONNECTION) ENDWALL COLUMNS & Z H <br /> 2X4 STAKE 2X4 STAKE -j Z t-N <br /> NAIL THIS GIRT <br /> APPROx 5' TO 6'�� <br /> ABOVE GRADE REFER TO THE DETAIL � <br /> Y <br /> (1)-16d COMMON HORIZONTAL INDICATED FOR THE <br /> BRACING PLY COLUMN CONNECTION REQUIRED <br /> NAILS (1 OR 2 PIECE) <br /> PROJECTION <br /> �—LINE <br /> ONE PLY GABLE TRUSS 3-PLY 4-PLY <br /> EW COL. EW COL <br /> Ebil <br /> 1. SET CORNER COLUMN FLUSH W/PROJECTION TRUSS TOP CHORD FF341 FF343 U <br /> LINE & MAKE SURE COLUMN IS PLUMB. Z <br /> 2. USE 2X6-10' MATERIAL AND 2X4 STAKES <br /> TRUSS BTM CHORD FF331 FF333 - <br /> FOR BRACES. VERTICAL TRUSS WEB FF371 FF371 Z <br /> PROJECTION 3. TACK BRACES INTO PLACE TO SUPPORT <br /> LINE CORNER COLUMN. TRUSS DIAGONAL WEBS FF351 FF353 0 <br /> 4. FILL & TAMP HOLE AROUND CORNER COLUMN. TRUSS HEEL ® CORNER I FF361 FF361 1n <br /> CORNER COLUMN TEMPORARY BRACING GABLE TRUSS TO ENDWALL COLUMN CONN. 384 & w <br /> F FO 15 UNI-FRAME I RO F F30 2 UNI-FRAME WALL FASTENING FULL R2 I~N <br /> J <br /> 2-16d COMMON NAILS (INSIDE OF J <br /> EACH CONNECTION BUILDING) PROJECTION <br /> PLY COLUMN LINE J <br /> (1 OR 2 PIECE) (INSIDE OF <br /> BUILDING) <br /> i n <br /> � N <br /> . � I <br /> " W � <br /> 1. STARTING AT ONE END SET ALL ENDWALL COLUMNS FLUSH C W <br /> WITH PROJECTION LINE & SPACE PER FLOOR-PLAN. 1. STARTING AT ENDWALL CORNER COLUMNS. SET SIDEWALL 3 <br /> COLUMNS PER FLOOR PLAN. N <br /> 2. USE 2 x 6-10' FOR TEMPORARY DIAGONAL BRACING rc <br /> W/2 x 4 STAKES. 2. SET THE SIDE COLUMN FLUSH WITH PROJECTION LINE. t) <br /> MAKE SURE COLUMN IS PLUMB. m <br /> 3. USE WALL GIRTS FOR TEMPORARY HORIZONTAL 3. USE 2X6-8' OR 10' FOR TEMPORARY DIAGONAL BRACING <br /> SPACING. AND FOR HORIZONTAL COLUMN SPACING. > <br /> 4. NAIL BRACING WITH 16d COMMON NAILS. 4. NAIL BRACING WITH 16d COMMON NAILS. Z <br /> 5. ALL TEMPORARY BRACING TO BE ON THE INSIDE OF N a <br /> 5. ALL TEMPORARY BRACING & GIRTS SHOULD BE NAILED THE BUILDING & THE HORIZONTAL BRACING TO BE 0 c02 <br /> TO INSIDE OF BUILDING. TO THE OUTSIDE OF THE BUILDING W Z V <br /> 6. FILL AROUND COLUMNS AND TAMP SOLIDLY AS DIRT IS (n _J $� <br /> PLACED IN HOLE. 6. FILL AROUND COLUMNS AND TAMP SOLIDLY AS DIRT IS W _ a 2 <br /> PLACED IN HOLE. <br /> m <W <br /> FF020 W/TEMPORARY BRACNGCNI-FRAME I RO FF025 TEMPO,COLUMN UNI-FRAME I RO <br />