Laserfiche WebLink
Scope of-proposed work: Because of the compbxIty of`Iuw*&qd rx of , <br /> wtneh requires the root to be opened and closed to the elements, with coordinating . <br /> of kwoWd contractors, B 1 and Ideal will provide installaters and en <br /> as needed to <br /> complete our work in a timely manner. B t estimates completion,of ur weep in <br /> apttroximatety 14 worth days or less based on contli mus wo Conditions- <br /> The <br /> andlt is. <br /> The follows is general n9 9 bi cteonoiogy of proposed work: <br /> A. Removal of existing roof.(shingles and_decking-and ' )by Garlock <br /> 1. Al removal by Garlock- suffuiord to allow for cleaworking conditions <br /> and at a `pate'which will bedeterminedonce work c menses <br /> B. Trep'work-at roof"attic'areas: <br /> 1. 61 and/or Ideal to inspect all work areas for a po ential preparatory <br /> sealant worK and to-perform such work as needed inkWing: <br /> a. Tape existing poly vapor barrier as needed <br /> b. lnst$tt new poly, sealed-in place, at.areas-d emed-necessary such- <br /> as wood ceiangs <br /> c_ Foam or caulk bypasses ineluell ft pkabing, teetrmat,fan <br /> !musings, etc. <br /> d. Box and seal any exhaust-fart feousings or r essed Ilgtd cans in <br /> attic spaces(also any speaker boxes) <br /> C. Ideal Systems foam spray: <br /> 1. At 2"X 6'framed roof`affic'areas, Ideal will spr up to 2'urethane <br /> foam to actreve highest R factor,R 14.4,and to ass sealed Imutation <br /> system best as possible <br /> 2. Ideal WE spray trom open roof on top of ea bft trod interior ceM9 <br /> materials (sheetrock or wood with vapor barrier) <br /> I. Ideal WE also spray `apeif attic areas deeper than X $I as per <br /> directed by 8 t to achieve some sealed best as possible system <br /> D. B t to re-insulate with fiberglass Insulation: <br /> 1. 2'X 6'framed roof areas: B Ito Install netting-over at framing from open <br /> roof side and blow full depth fiberglass to R 15 <br /> 2. Open attic areas deeper than 2'X 6': B Ito blow d eper attic areas up <br /> to full depth or minimum R-44 <br /> -2- <br />