My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01443 - storm damage repair
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0460 Tonkawa Road - 05-117-23-32-0002
>
Permits/Inspections
>
2016-01443 - storm damage repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:46 PM
Creation date
5/16/2019 2:41:25 PM
Metadata
Fields
Template:
x Address Old
Address
0460 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0511723320002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observation Report Gage @ 460 Tonkawa Road <br /> A. It is Pie's determination,based on a reasonable degree of engineering certainty, that the <br /> energy from the lightning strike exploded the smoke detector mounted on the LVL <br /> window mullion.The structural damage from the explosion is limited to the LVL mullion <br /> it was mounted to.The lightning strike also caused cosmetic damage to the roofing,glass <br /> windows,and interior finishes. <br /> 1. The damaged full-height structural LVL window mullion should be removed and <br /> replaced. <br /> a. Temporary shoring by the contractor is recommended. <br /> b. The connection of the LVL beams fastened to this LVL mullion should be <br /> restored. Though no damage to the beams were observed on site, the <br /> contractor should verify that the beams were not affected by the explosion. <br /> C. All members and connections should be restored/replaced to their original <br /> configuration. <br /> 2. Damaged roof shingles should be removed and replaced. The contractor should <br /> verify that the underlying structure/roofing was not affected by the lightning <br /> strike. <br /> 3. It was discussed on site that the window sealants on the remaining windows that <br /> are intact may have been compromised. Therefore, in addition to the shattered <br /> window,all windows should be removed and replaced at the north window wall <br /> of the living/sitting room. <br /> 4. The northernmost timber roof rafter at the west slope of the living/sitting room <br /> should be repositioned in the original location and re-fastened to the surrounding <br /> members. <br /> 5. Scuffed members at the interior should be repaired or replaced. <br /> B. The repair recommendations included herein should be utilized for conceptual and <br /> estimating purposes and not interpreted as a repair design for which Pie Consulting & <br /> Engineering is the engineer-of-record. Any repairs should be conducted by a licensed and <br /> qualified general contractor in accordance with the requirements of the Authority Having <br /> Jurisdiction. <br /> Pie Consulting&Engineering Page 4 of 5 MN716226.00(000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.