My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004655 - mound system
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0315 Tonkawa Road - 06-117-23-14-0021
>
Septic
>
1992-004655 - mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:47 PM
Creation date
5/13/2019 1:47:28 PM
Metadata
Fields
Template:
x Address Old
Address
0315 Tonkawa Rd
Document Type
Septic
PIN
0611723140021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4k ' <br /> CITI' OF ORONO Permit I <br /> SEPTIC SYSTEM APPROVAL Fee $ <br /> Entered By <br /> The General Contractor will be given a copy of this report and is <br /> DESIGN IS NOT <br /> OTfor its CONS CONSIDribution to all ERED APPROVED UNLESSnTHIS SHEETtIS ATTACHED- <br /> LOCATION: <br /> SYSTEM <br /> DESIGN IS NO <br /> LOCATION: J/-1 :;P? <br /> GENERAL CONTRACTOR: PHONE. <br /> SEPTIC CONTRACTOR: PHONE: <br /> / PHONE: <br /> OWNER: rangy <br /> ❑ APPROVED <br /> CONDITIONALLY APPROVED: (Note Changes Below) <br /> COMMENTS: <br /> : <br /> 4e /r <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and spcs must have, prior <br /> approval of the Inspector (473-7357e <br /> ). Call for inspections 24 hours in advance. <br /> NOTICE TO GENERAL CONTRACTOR$: Primary and alternate drainfield sites MUS' <br /> be protected <br /> prior to and after system installation to avoid compaction of the natural soil. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must <br /> l site grading. Approval to pour footings will not be granted <br /> remain in place until fina <br /> until the Inspections Department has verified that primary and alternate sites are <br /> adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY RIND (cars, trucks, earth moving equipment, etc.) is allowed <br /> within 20' of tested drainfield sites either before or after system construction. This <br /> applies to the lot you are working on and all adjacent lots. You could be held liable for <br /> damaging sites on neighboring lots. <br /> VEHICULAR TRAFFIC CAN CAUSE SOIL es may forrevocationrrevocaatiRING onl ofDbuild nq permits. <br /> Evidence of traffic on drainfield sites may <br /> Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br /> �t <br /> g i y <br /> Date Approved Y of Orono <br />
The URL can be used to link to this page
Your browser does not support the video tag.