Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
8. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 9. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 10. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled with native soils. An inspection is required after the tanks are <br /> pumped and before the tanks are crushed and filled. <br /> / PERMIT TYPE AND FEE CALCULATION <br /> $50.00 -Principal Structure <br /> $30.00-Accessory Structure <br /> 1. Subtotal of above permit requested $ So <br /> 2. State Surcharge $ .50 ' <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are complete,true and c rrect. <br /> �WGc-c,J <br /> APPLICANT'S SIGNATURE• \`g atAK Date: !2: _ <br /> or <br /> OWNER'S SIGNAT Date: /0—//p <br /> 6 APPROVED BY: Date: 6'30 —Q J <br /> (Building Official) <br /> *ZONING DISCLOSURE REQUIRED? iK YES ❑ NO <br /> * This Must Be Filled Out By Zoning Department - For Either Answer, A Zoning Official Must Sign All <br /> Applications <br /> *APPROVED BY: C� �`` Date: S <br /> (Zoning Official) <br />