Laserfiche WebLink
r , <br /> FOUNDATION AND CONCRETE WORK a i' <br /> 1. Concrete shall be 4000 psi 4 inches thick with a 12 inch deep by 12 inch wide thickened footing around <br /> the entire perimeter. l0 <br /> 2.The thickened footing shall be reinforced with 2#4 rebars for the entire length of the perimeter. <br /> 3.The 4 inch thick slab shall be reinforced with wire mesh. <br /> 4. 4 inches of compacted sand shall be under the entire slab. <br /> 5.Anchor bolts will be 1/2"x 14". They shall be placed 1 foot maximum from each comer of the <br /> building, 1 foot from all door openings and at 6 feet intervals for the remaining wall areas. <br /> 6. 1 course of 8"x 16" concrete block will be laid on top of the slab for the wood framing to sit on top of. <br /> 10,4 <br /> FRAMING AND STRUCTURE I <br /> 1. A sill seal shall be place between the concrete block and the wood framed walls. <br /> 2. Walls shall be constructed of 2 x 4 nominal wood studs 16 inches on center. Studs shall be 104"precut <br /> 3.The bottom plate shall be pressure treated 2 x 4 nominal. I <br /> 4.The top plate shall consist of 2-2 x 4 nominal. <br /> I � ! <br /> 5. Wall sheathing shall be 7/16" OSB. <br /> ;► oS>3 Z-4 paGssu <br /> 6.The overhead garage door will be 16 feet wide by 8 feet tall. (� . i <br /> -r ly <br /> 7. The overhead garage door header shall be 2- 13/4"x 117/8" micro laminated beams. <br /> 8.Man door shall be 28"wide steel prehung. t x 11O/l <br /> 9. Windows shall be 48"x 48"maintenance free aluminum clad exterior. <br /> i <br /> !0.The man door and window headers shall be 2- 13/4"x 117/8"micro laminated beams. <br /> 11.Roof pitch will be 6/12. irj t L t, <br /> t 5 amu- 000 ps-� <br /> 12.Preengineered trusses shall be used at 24" on center, spanning side to side. MIN. WOOD TO ARTH SEPARATION 6" <br /> 13.Roof sheathing shall be 1/2" OSB with H clips in between sheets. <br /> CITY OF ORONO <br /> 14.Facia board framing shall be of 2 x 6 nominal construction. BUILDING RMI- f"LAN REVIEW _- <br /> INSPECTOR <br /> 15. Side overhangs shall be 24" soffets. :-DATE .S• Z.6 - G ,,*T J <br /> P,_PhJi ti0. ir�i /� m� <br /> ❑ APPROVED AS�, fat,11TTED •' ^r l�0 <br /> 16. Gable end soffet overhang shall be 12". PROt+ct�i(l%1TN CORRECTIONS AS N"T`' �c� �_ ►ter�� 5�J D <br /> lors and style to match existing house. <br /> ❑ NO Ti A!=PF�0VED---CORRECT a RESUBl3/,!T I r <br /> 17. Siding and soffet materials shall be aluminum,co -These comments are for your information.All work shall be done <br /> =in fdl compliance with al appl cable building and zoning coda. <br /> 18.Roofing materials shall be 15#felt under layment with fiberglass 20 year shingles to match t gKEE THIS PLAiests N SET O J cif: M AT ALL TItr1ES <br /> existing house. <br />