Laserfiche WebLink
4, TOTAL EXPOSED ROOF/CEILING CALCULATIONS : <br /> Total exposed <br /> roof/ceiling area. . . . . , . . 11(� sq ft <br /> j) Total skylight area. . . . . . — sq ft x "U" <br /> Q Total roof/ceilinq framing <br /> area (Average 109,) . . . . . /a0 sq ft x "U" <br /> 1) Total net insulated <br /> roof/ceiling area. . . . . . . I C) sq ft x "U" .02-L; <br /> 4• TOTAL J) thru <br /> If total of #4 is the same as , or less than N2, you have met the intent of <br /> 2 MCAR 1.16008 A and 0. <br /> 1 <br /> t _ <br /> ALTERNATE BUILDING ENVELOPE DESIGN <br /> To utilize the total envelope system methtid, the values established by the sum <br /> of items N3 and #4 shall not be greater than the sum of items N1 and #2. <br /> + 2. 3 I l oz�. 06 <br /> 3• — / 7 6,69 + 4. x703 X03,`11 <br /> C E R T I F I C A T I O N <br /> I hereby certify that I have calculated the "U" factors and "R" <br /> values herein and that the building here described meets or exceeds the State <br /> of Minnesota Energy Conservation Act. <br /> Signature <br /> (Date) <br /> Page 2 <br />