Laserfiche WebLink
Part B. DEPRESSURIZATION PROTECTION <br /> Check option used: ❑ Fuel burnin_g equipment (coniplete schedules below) ❑ No fuel burning equipment <br /> I\;rra'CHONS EXHAUST/MAKE-UP AIR SCHEDULE" <br /> Step I- Complete the Combustion Equipment Schedule below. Only equipment Exhaust devices over 300 cfm Flow <br /> with a 'Ir' (Ye:) nia\ be selected under the"Cntegory 1"alternate. ( of <br /> Step2- Complete 1:-_rh,.rusi':11ake-ire Air Schedule on the right if director power cl <br /> vented or solid flue atmospheric vent space heating equipment is selected. I cf <br /> COMBUSTION EQUMMENT SCHEDULE <br /> (check all types proposed) <br /> Space heating—nonsolid fuel 2Sjalcd combustion Y Hearth — nonsolid fuel Se d combustion 1 <br /> Direct or poker vented Y* irect or power vented ')l <br /> mospherically vented N Atmospherically vented t <br /> Water heating—nonsolid fuel S led combustion Y Space heating—solid fuel ❑ Atmospherically vented <br /> Direct or power vented Y Water heating—solid fuel ❑.Atmosphericalh•vented <br /> Atmospherically vented. N. Hearth—solid fuel Q Atmospherically vented N <br /> • If atmospherically vented solid fuel or direct or power vented nonsolid fuel space beating is installed, then make-up air to mat( <br /> flow is required for each individual exhaust device which exceeds 300 cubic feet per minute. <br /> Part C1. VENTILATION <br /> VEiNTILATION QUANTITY <br /> (Mechanical ventilation must be provided per the larger quantity calculated below) <br /> cubic feet x 0.00583/minute = �cfm { �� x 15 cfm/bedroom)+ 15 cfm= cftr. <br /> volume df habitable rooms number of bedrooms <br /> VENTILATION FAN SCHEDULE <br /> I Check method(s)proposed 4 FO Exhaust only alanced (heat recovery.ventilator,air exchanser,etc.) <br /> Fan description or location 4 4- �, b. V ;lk, �r r ye S TOTALS. <br /> VENTILATION . Intake cfm @ cfm e o cfm 60 cfm �. Ztb cfr <br /> AS DESIGNED Exhaust efm v cfm cfm cfm ZLt,,.. cfr <br /> Statement of Compliance: The proposed building design represented in these documents is consistent with the building plan <br /> specifications, and other calculations submitted with the permit application. The proposed building has been d:sisned to meet tl <br /> requirements of the Minnesota Energy Code. <br /> Applicant(print name) Sii;nature Date. Telephone number <br /> Part CZ. .VENTILATION (Submit Part Cz upon completion ofsystem"Verification= <br /> �: -------------------------- -------------------- ------ ----- ---- - <br /> Job Site.Address: Permit;�um.e: <br /> Fan-description or location TOTALS.. , <br /> MEASURED Intake cfm cfm cfm cfm I cfn <br /> PERFORNIANCET 1 ExhaustF cfin cfm j cfm cfm cfr <br /> T Ventilation rate must be measured and verified when the performance option is used in lieu ofthe prescriptive option for the sealin <br /> of joints in the building conditioned envelope(from Part A). <br /> Compliance Statement: In,t Iled"venti!:lwo .+iivni t; in ctnnpliance with MN Encrgy Code and is sized to provide the design air flora <br />