My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-1991 Council Minutes
Orono
>
City Council
>
1991
>
10-28-1991 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2019 8:52:25 AM
Creation date
4/30/2019 8:52:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING — OCTOBER 26, 1091 <br />HOLIDAY DECORATIONS — CONT. <br />It was moved by Jabbour, seconded Butler, to instruct staff to <br />assist the Navarre Business Community in installation and storage <br />of Christmas decorations, and to obtain the lowest most <br />reasonable bid.for installation not to exceed $1,000. Ayes 5, <br />nays 0. <br />Symons explained that there is a Shoreline Beautification Fund of <br />which one —third 'of the money can be used if the parent City <br />matches the dollar amount used. She noted that Orono's portion <br />of the fund is $425:00. <br />Butler noted they may consider this after they see what the <br />installation cost is going to be. <br />Jabbour directed staff to get the installation bid within the <br />$600 range so as-to allow the additional $400 to be given to the <br />business community to use for the purchase of the decorations. <br />(##11) BID AWARD — CITY FACILITIES — SITE PREPARATION PARTIAL <br />PUBLIC WORKS FACILITY <br />Moorse introduced John Davies of Kraus Anderson. <br />Davies submitted to the Council a bid tabulation for the Public <br />Works' portion of the project. He noted it included overall <br />grading of the site, foundation, purchase of the building, <br />utility work, and masonry work. The remainder of the building <br />would be bid at a later date. <br />Davies explained the cover sheet as follows: the contract for <br />the city hall and police department has not yet been bid so the <br />dollar amount estimated by Boarman has been carried over. The <br />public works construction was budgeted for $1,176,000, of which <br />only a portion has been bid and the rest has been taken from an <br />estimate by Kraus Anderson, which totals to $1,175,891. Unheated <br />storage has yet to be bid. He noted that under site development, <br />site utilities $15,000 has been estimated to complete stormwater <br />drainage. Soil correction was budgeted for $160,000 and was bid <br />at $202,000. He noted they received two bids, which indicates a <br />bid spread. He noted that both excavators felt there were worse <br />soils than anticipated. Davies noted that of the bid, $52,000 <br />has been distributed to the Public Works building, the remainder <br />is under the soil correction column. All other items on the <br />sheet are just estimates at this point. <br />Davies noted that they are overbudgeted just in the bids. He <br />noted that from the initial budget, they are'$31,891 over. <br />Jabbour asked what dollar amount they were to award at this time. <br />Davies stated that if it were awarded as recommended it would <br />total $713,133. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.