My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-1991 Council Minutes
Orono
>
City Council
>
1991
>
10-14-1991 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2019 8:50:58 AM
Creation date
4/30/2019 8:50:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />N <br />y1 • <br />T MINUTES OF THE REGULAR ORONO COUNCIL•MEETING-- OCTOBER 14o 1991 <br />(##24) CONTRACT WITH KRAUS— ANDERSON FOR CONSTRUCTION MANAGER <br />SERVICES <br />Moorse explained the contract sets the basic compensation at 3% <br />of the total project or a maximum of $89,443. <br />Jabbour asked if the contract indicates an either /or option. <br />Moorse clarified that if the bids come in low, their fee could--be—: <br />reduced. <br />Jabbour agreed and noted that the contract should state that if-, <br />the project is bid at less, the contract amount would go down, <br />and we should give an exemption to Kraus — Anderson to allow <br />subsidaries to work on certain parts of project not subject to <br />the 3 %. <br />Callahan explained they picked a figure lower than 3% that was to <br />be the maximum. In the event of change orders, Orono does not <br />want to be locked in should the project escalate. If bids are <br />increased, the maximum is $89,443. <br />Moorse referred to the last page of the contract which involves <br />Public Works equipment allowance. He noted that large items such <br />as hoists, fueling system, etc. are outside the project cost, but <br />the Council may want Kraus — Anderson to supervise the installation <br />of these large items which could increase their fee up to $5,000. <br />Gerhardson noted that the project cost does not include the salt <br />building. <br />Moorse next explained the reimbursibles, which are basically the <br />field superintendent. He noted that Article 17 deals with <br />general expenses, which they will do and charge us only their <br />costs. <br />( *##25) LICENSES <br />It was moved by Mayor Peterson, seconded by Jabbour, to approve <br />the following license: <br />Minnetonka Center for the Arts — One Day Set Up Permit <br />2240 North Shore Drive <br />Holiday House <br />November 20, 1991 — 6 to 10 p.m. <br />( *##26) BILLS <br />It was moved by Mayor Peterson, seconded by Jabbour, to <br />approve payment of the All Funds Account. Ayes 4, nays 0. <br />PIN <br />
The URL can be used to link to this page
Your browser does not support the video tag.