Laserfiche WebLink
ka � <br />REGULAR CITY COUNCIL MEETING HELD MARCH 25, 1991 <br />(#2)NAVARRE HEIGHTS DRAINAGE CONTINUED <br />Cook stated that Staff had met with the people on Togo Road <br />azd determined that there is a problem in that area. He said, <br />"It is our belief that the problem on Togo Road is independent of <br />the Livingston Avenue problem and should be addressed separately. <br />The City will provide some ditching and minor repair work in that <br />area. The property owner in that area with the worst problem has <br />indicated that he would be willing to do some grading on his lot. <br />We informed him that we would stake the property to give him some <br />guidelines. I do not think there is need to complicate the <br />Livingston Avenue problems by adding the Togo Road problems. <br />Butler asked Cook if, in his opinion, the problem on <br />Livingston Avenue could be addressed by grading and /or ditching, <br />and landscaping. <br />Cook replied, "Yes it could be. The swale would go across <br />the Cuffs' Lot 17." <br />Butler asked if there is some way to engineer a Swale so <br />that it would provide a dry buildable area on the lot, without <br />causing severe erosion. She added, "I would think that everyone <br />would be happy with the project if the only cost was hiring a <br />landscaping contractor to re- contour Lot 17 to accommodate the <br />drainage. Of course, the drainage can only be accommodated <br />insofar as it does not affect the properties downstream." <br />Cork replied, "Once the water is drained from the road <br />north, there is a second property north of the Cuffs about which <br />we are concerned if we were to install an open ditch. If there <br />is a heavy rainfall, that property would receive more drainage. <br />I would be more concerned about the City's potential liability <br />for the properties downstream. If the City does anything, it <br />should be done correctly, or not at all." <br />Bernhardson stated that there are other Navarre areas s:ich <br />as Kelly Avenue, and two separate locations on Casco Point Road <br />that are experiencing water problems. <br />Butler asked if a 4 /5ths vote would be necessary to get the <br />project started. <br />Bernhardson stated that only a 3 /5t.hs vote would be required <br />to authorize Staff to advertise for bids and order the special <br />assessment, but a 4 /5t.hs vote would be necessary to order the <br />project. <br />Butler asked what are the project cost estimates and by how <br />many properties would that sum be divided. <br />Cook replied, "The project cost estimate is $32,500." <br />