My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-25-1991 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1990-1999
>
1991
>
03-25-1991 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2019 8:27:43 AM
Creation date
4/30/2019 8:27:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR CITY COUNCIL MEETING HELD MARCH 25, 1991 <br />( #2)NAVARRE HEIGHTS DRAINAGE CONTINUED <br />Hearing, and the matter was tabled to allow time for Council to <br />review that letter. Bernhardson explained the proposed project, <br />noting that the project costs would be assessed to residents in <br />the area of the project at an estimated cost of $700 per lot. He <br />asked Glenn Cook to display the overhead showing the project <br />area. He said, "This project called for the installation of <br />storm sewer pipe from Livingston A °ienue through what is known as <br />the Cuff property to Crystal Place. At the Public: Hearing last <br />Fall, there was concern regarding drainage on the north side of <br />the railroad tracks and Togo Road. That issue was reviewed by <br />the City Engineer who determined that installing the pipe on <br />Livingston would not increase the drainage problem on Togo Road." <br />Cook used the sketch to show the drainage pattern in the <br />Livingston Avenue area and how it drained under the railroad <br />tracks to the Togo Road area. He indicated that the property <br />owners of Lot 14 (3635 Togo Road) are experienci ::ig the most <br />severe water: problems in the T.:-)go Read area. He said, "We <br />discussed their water problems with them and will work with them <br />to try to improve drainage over their p-operty. The water <br />problems for that property will not change if the Livingston <br />Avenue project is done." <br />Bernhardson reviewed the process that would occur following <br />this Public: Hearing, if in fast the Council votes to advertise <br />for bids. <br />Mayor Peterson explained the procedure to follow for those <br />wishing to participate =_n the Public: Hearing. She then <br />recognized Tony Gleekel, the AiCtorney for Mark and Karen Cuff. <br />Gleekel referred to his March 20, 1991 letter which he had <br />sent to the City and asked Council if t;iey had received and <br />reviewed that letter. <br />Council indicated that they had read Gleekel's March 20, <br />1991 letter. <br />Gleekel said, "I would hope that a final decision would be <br />made this evening to advertise for bids and that the matter not <br />be tabled. Since the December 10, 1990 Public Hearing, new <br />circumstances have risen, which support the Cuff's claim that <br />they have a water drainage problem. The Cuffs have had to pay <br />approximately $15,000 :o repair the foundation of their' home <br />which has suffered extensive water damage. The Cuffs house sits <br />fairly low in relation to neighboring properties. The only way <br />that drai,iage problems resulting from that situation can be <br />addressed is by installing an underground pipe. Other <br />alternatives have been explored throughout the review of this <br />issue and it has been determined that there really are none. <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.