My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-23-1992 Council Minutes
Orono
>
City Council
>
1992
>
11-23-1992 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 3:46:05 PM
Creation date
4/29/2019 3:46:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING <br />HELD NOVEMBER 23, 1992 <br />PHEASANT LAWN HOMEOWNERS' ASSOCIATION - CONT. <br />Callahan noted historically, there was considerable innovative <br />character. in dredging and the dredging was done solely to create <br />riparian use. He stated this was done with approval from the City. <br />It was moved by Callahan, seconded by Jabbour, to adopt Resolution <br />#3205 directing staff to issue a Joint Use Dock License to Pheasant <br />Lawn Homeowners' Association subject to conditions noted therein <br />for the period of November 23, 1992 to December 31, 1993. Ayes 5, <br />nays 0. <br />( * #9) SHORELAND FLEXIBILITY REQUESTS <br />It was moved by Butler, seconded by Mayor Peterson, to accept the <br />information on.the shoreland flexibility requests as presented... <br />Ayes 5, nays 0. <br />MAYOR /COUNCIL REPORT <br />A) Callahan noted that Shorewood, along with other cities, has met <br />with differences with the MWCC activities. He asked the status of <br />the City of Orono. <br />Moorse explained, Orono along with most lake cities, has <br />experienced similar problems with regard to the rate increase by <br />the MWCC due to a higher water table and infiltration and inflow. <br />He added, the MWCC is two years behind from projection of cost to <br />pay request, thus part of the problem. The CIty - EngIneer is <br />reviewing the status to make sure Orono is within the realm of <br />reasonability regarding the charges. <br />Callahan asked if the additional charge is in part due to leakage <br />into the pipes. <br />Moorse stated that was part of it, and also run -off into manholes <br />contributes. <br />Jabbour suggested implementing an inspection of sump pumps to <br />ensure they are not being pumped into the system. <br />Moorse stated that has been discussed. <br />Jabbour felt that should be implemented as soon as possible. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.