Laserfiche WebLink
MINUTES OF THE CONTINUATION OF THE STUBBS BAY ASSESSMENT HEARING <br />HELD BY THE ORONO COUNCIL ON <br />HELD MAY 18, 1992 <br />Callahan felt that it could easily happen that a future owner would <br />be unaware of the required hookup charge. <br />Barrett stated that information would not hi <br />disclosed. He indicated that the only way to <br />owner was informed would be to file a document <br />of title, however on torrens property that would <br />He explained that future property owners would <br />City ordinances in effect at that -time. <br />ive to be legally <br />ensure the future <br />against the chain <br />be very difficult. <br />be subject }to the <br />Butler reviewed a memo by Gaffron entitled, "Extended period for <br />sewer connection ", whereby the following conditions were suggested: <br />1. All failing systems shall connect to the sewer <br />immediately upon the availability of the sewer. <br />2. All systems determined to be non- conforming, <br />including those too near the water table and /or less than <br />75' from the creek or lake and /or less than 50' from a <br />well shall connect to the sewer within 16 months of its <br />availability. <br />3. Any conforming functioning system constructed before <br />1/1/78 shall connect - to the sewer within 16 months of its <br />availability. Such systems will have had a useful service <br />life of 15 years or more. <br />4. Any conforming system constructed between 1/1/78 and 1/1/88 <br />shall connect within 36 months of sewer availability or by <br />1/1/96, thus ensuring that such systems shall have had a <br />useful service life of between 8 and 17 years. <br />.5. Any conforming system constructed after 1/1/88 shall <br />connect within 60 months of the date of availability or by <br />•1/1/98, thus allowing a minimum of 6 years and up to 10 years <br />of useful service life for those systems. <br />6. Regardless of the above allowances, the sewer must be <br />connected upon any sale of the property served with sewer. <br />7. All properties regardless of connection status, start <br />paying-the quarterly sewer charge at the end of the 16 month <br />standard connection period. <br />Shaw asked If he has a double mound septic system, but is currently <br />only using one,of those, would he be allowed to switch to use the <br />remaining one before required to hookup. <br />6 <br />