My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05089 - heating system
Orono
>
Property Files
>
Street Address
>
T
>
Togo Road
>
3700 Togo Road - 17-117-23-31-0025
>
Permits/Inspections
>
2002-P05089 - heating system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:35:59 PM
Creation date
4/29/2019 2:51:31 PM
Metadata
Fields
Template:
x Address Old
House Number
3700
Street Name
Togo
Street Type
Road
Address
3700 Togo Road
Document Type
Permits/Inspections
PIN
1711723310025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
llrt� <br /> RESIDENTIAL-COMMERCIAL HEATING &AIR CONDITIONING <br /> 2619 Coon Rapids Blvd., Coon Rapids, MN 55433 <br /> OOR AIR QUALITY INC. (763) 757-5040-FAX (763)757-5751 <br /> PARTY AGREEIN TO CONWE: DATE JOB NIJB <br /> ((;; April 15, 2002 <br /> STREET JOB NAME <br /> Sue Fackler <br /> CITY,STATE AND ZIP CODE JOB LOCATION <br /> 3700 Togo Road, Wayzata 55391 <br /> PHONE 763-471-0 Q�PHONE PROJECT DIRECTOR <br /> JOB TO CONSIST OF: <br /> 1. Remove and re-install furnace with new smallerlenum with a I `= <br /> p larger 20X25 drop. <br /> 2. Add new ductwork for return. (approximately 12 feet) <br /> 3. Re-mount A-Coil. ` <br /> 4. Re-vent furnace. <br /> 5. Replace tee in flue with drip tee. <br /> 6. Re-wire and gas. <br /> *NOTE: MAY NEED NEW LINER..., <br /> RM919MVIIIIIIIIII Ir.11m;WNEVIEN I 9J Imer,I a I M L01 a MA N Mil Le 0 K Z1.1 OLOJ s II1.1 I ej r4wMa'a I I M M Lex"ung M:I ven VAM P I A-A I I I I I mm a a][Rer,to I I Lei N JIM a 10 1 WeA I I E 2 Lei a via 1 1 W. M. <br /> WE PROPOSE HEREBY TO FURNISH MATERIAL AND LABOR-COMPLETE IN ACCORDANCE WITH ABOVE SPECIFICATIONS,FOR THE SUM OF <br /> All material is guaranteed to be as specified. All work shall be completed in a <br /> workmanlike manner according to standard practices. Any alteration or deviation Due Dependable <br /> from above specifications involving extra costs will be executed only upon written <br /> orders,and will become an extra charge over and above the amount set forth above. 50% Down Payment <br /> We shall not be responsible for delays caused by strikes, accidents, or other y <br /> contingencies beyond our control.Owner to carry fire,tornado and other necessary <br /> insurance.Our workers are fully covered by Workmen's Compensation Insurance. Balance Due <br /> All products and equipment remain the property of Dependable Indoor Air until paid To be paid on completion unless it has been previously arranged to be <br /> in full.This proposal is subject to approval by Dependable Indoor Air and becomes paid in full by a financial institution. 1.5% per month interest will be <br /> a contract when work starts. charged beyond'ItM C-ho, i nard <br /> The above prices, specifications, and conditions are hereby agreed to and Estimator <br /> accepted. Dependable Indoor Air Quality is hereby authorized to do the work as <br /> specified.We have read and agree to the provisions regarding interest and have Accepted by Dependable <br /> read the Notice regarding mechanics liens on the reverse side of this contract, <br /> understand the language contained there in,and in the event of a default in payment CUSTOMER ACCEPTANCE Date <br /> as provided here in(1)(we)will be responsible for and pay the reasonable amount <br /> -of attorneys' fees and costs incurred by Dependable Indoor Air Quality Inc. in Signature <br /> collection of the amount due. <br /> This proposal may be withdrawn if not accepted within 5 days. I Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.