My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-1993 Council Minutes
Orono
>
City Council
>
1993
>
08-23-1993 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 12:54:22 PM
Creation date
4/29/2019 12:54:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING <br />• HELD AUGUST 23, 1993 <br />SEPTIC UPGRADES - CONT. <br />For properties that have a failing or illegal system, site evaluation and system upgrade would <br />be required before any permits are issued. <br />When ground conditions don't allow a site evaluation, the owner acknowledges some risk in <br />proceeding without a site evaluation. Alternative solutions could be: <br />1. Site evaluator to identify probable sites for system upgrade meeting setback and <br />slope requirements and soil conditions. <br />2. Building permit applicant should provide evidence of a contract with a site <br />evaluator so there is proof the upgrade will be done as soon as weather conditions <br />permit. <br />3. Applicant should agree in writing to complete the septic upgrade within the <br />appropriate time frame for his project. <br />4. Applicant should agree in writing that the construction project will stop if the site <br />• evaluation finds there is no way to repair the system. <br />If no way is found to repair a system, the City would issue no further permits until the situation <br />is resolved (possibly holding tanks or a variance). <br />There is concern over certain areas of the City which the 1980 Comp Plan identified as areas <br />to monitor for future sewer. If there are a number of systems within one of these clusters that <br />are failing, perhaps a better solution than repairing each system would be to consider sewer for <br />that area. The time frame for repairs may need to be extended. <br />Mayor Callahan noted that this study has been because changes have been made to the time <br />frame allowing repair of failing systems, two years instead of one. Gaffron confirmed there are <br />about 1100 septic systems in the City. Possibly half of these systems could be affected but until <br />inspections are completed, this is a rough estimate. This would be one -fourth of all homes in <br />Orono. If each system cost about $3,000, it would cost residents of the City almost $2 million <br />to repair or replace their systems. <br />is 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.