Laserfiche WebLink
DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2005 Rate=$1,450.00) $ r <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid, a sewer connection permit will not be issued) <br /> 2� U <br /> F1Sewer Con ntion/Disconnect/R U <br /> air($35.00/Per Stub) $ J <br /> Pipe size inches;material-' Schd 40 air tested; cast iron <br /> ❑Water Connection/Disconnect/Repair($35.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> i <br /> 2 � <br /> 1. SUBTOTAL of Permit Requested: $ J� o <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ 2 00 <br /> ADDITIONAL INFORMATION'-WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of meter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work iM <br /> h the ordinances of the City and the regulations of the State of <br /> Minnesotaatements made on this application are,true and correct. <br /> Applicant: Date. �� <br />