My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-1994 Council Minutes
Orono
>
City Council
>
Minutes
>
1990-1999
>
1994
>
07-25-1994 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 12:54:15 PM
Creation date
4/25/2019 12:54:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING HELD <br />• JULY 25, 1994 <br />#1938 DOUGLAS AND KAREN OLSON, 537 PARK LANE (CONTINUED) <br />approve a 6' setback from the corner of the garage with the structure still being 42` from the <br />traveled road in approximately the same location as it currently exists. At the July Planning <br />Commission meeting, members approved an amended application with the corner of the garage <br />6' from the lot line and the principal structure maintained at 10'. The southeast comer of the <br />deck will have an 8' setback. <br />The applicants are also requesting a street setback variance, a setback variance to the bluff of <br />10' and 8' for the deck. <br />The two story structure meets the height requirements and average Lakeshore setback. <br />Mr. Olson commented that they had compromised to get back from the bluff and yet not too <br />close to the road since there is an 80' right -of -way. <br />Mabusth added that there is a hardcover variance requested in the 75 -250' setback area proposed <br />at 26.4 % with a reduction from 3.5 % to 1.8 % in the 0 -75' setback area. Retaining walls and <br />walkways that are not necessary are being removed within the 0 -75' setback area. <br />In response to Hurr, Mabusth confirmed that the surveys were current and the applicant had <br />done the hardcover calculations. She added that applicants often do their own calculations with <br />spot checks by staff. <br />is Hurr asked what the hardship is for this new home. Olson responded that the home would be <br />consistent with neighboring homes. When he purchased the home, he did not realize there was <br />a bluff issue. He felt with the added grassed area, even though it was not deeded to him, it <br />could be a positive consideration. Mabusth added that 30% of the lot was available for building <br />as the bluff placed severe restrictions upon the building envelope. <br />Goetten noted that the Olsons and Planning Commission members had worked hard to achieve <br />the current proposal for the substandard property. She would support the Planning Commission <br />recommendation. <br />It was moved by Kelley, seconded by Goetten, to adopt Resolution No. 3452 for Douglas and <br />Karen Olson granting variances for lot area, lot width, street setback, hardcover and bluff <br />setback to permit the construction of a new principal structure located at 537 Park Lane. Ayes <br />4, nays 1. Hurr was opposed. <br />( *#'n #1943 SAM AND JOYCE MARFIELD, 2455 SCOTCH PINE LANE - VARIANCES <br />- RESOLUTION NO. 3453 <br />It was moved by Jabbour, seconded by Goetten, to adopt Resolution No. 3453 granting a <br />hardcover variance of 46.32 s. f. or .015% and a setback variance of 9' or 30% to allow <br />construction of a two story elevator addition for Samuel S. Marfield and Joyce Marfeld at 2455 <br />Scotch Pine Lane. Ayes 5, nays 0. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.