My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-1995 Council Minutes
Orono
>
City Council
>
1995
>
10-23-1995 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 9:52:24 AM
Creation date
4/25/2019 9:52:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON OCTOBER 23, 1995 <br />. ( 95 - 42000 Cortlen Cloutier - Continued) <br />Hurr questioned if the sewer unit has been paid. Mabusth said one sewer connection <br />charge is to be paid but the lateral and trunk charges have been paid against the property. <br />Two water units have also been paid. This does not include lot 3. Hurr noted that the <br />payment of sewer and water charge does not guarantee that the lot will be buildable. <br />Jabbour inquired about the boathouse on the property. Mabusth reported that if Cloutier <br />desires to make any changes to the boathouse, he must apply for a variance for structural <br />improvements. <br />Jabbour moved, Goetten seconded, to adopt Resolution #3621. Vote: Ayes 5, Nays 0. <br />Hurr clarified that the division of the property is not based on the connection with the <br />ownership between family members. Mabusth concurred that this was not in the findings <br />of-the resolution. <br />( * #6) #2051 MICHAEL HILBELINK, 2760 WATERTOWN ROAD - FINAL <br />SUBDIVISION APPROVAL - RESOLUTION #3622 <br />Hun moved, Goetten seconded, to approve Resolution #3622. Vote: Ayes 5, Nays 0. <br />( #7) #2041 PHIL AND DARCY OTTO, 4116 HIGHWOOD ROAD - AFTER THE <br />is FACT CONDITIONAL USE PERMIT - RESOLUTION #3623 <br />is <br />The Applicants were present. <br />Mabusth reported that the original variance application for new construction was <br />approved for a single access off of Hghwood. The property contains steep elevations <br />requiring cuts to gain access to the garage. Retaining walls were shown on the original <br />plans. During construction, however, further excavation was performed, some during the <br />digging of the well and some due to the difficulty in maneuvering at west stall, which <br />resulted in two tiered retaining walls being constructed 4' from the lot line. A new curb <br />cut was also created, which has subsequently been approved by John Gerhardson. The <br />additional fill was placed in the side and rear yards. The drainage was a concern and a <br />catch basin was discussed. Gutters and downspouts with a the funneling through to <br />another tile was added. There was a question on how to restore the bank without <br />encroaching the neighbor. The slope was restored with planting crown vetch and placing <br />a curlex blanket to stabilize the soils. The Engineer has signed off on this but will <br />reinspect during various stages of restoration. One such reinspection will occur before <br />seeding to look at the island area and the grades. The Engineer did approve the retaining <br />walls also. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.