My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-09-1995 Council Minutes
Orono
>
City Council
>
1995
>
10-09-1995 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 9:51:33 AM
Creation date
4/25/2019 9:51:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON OCTOBER 9, 1995 <br />(Mayor /Council Report - Continued) <br />k h also had a meeting with the Right-of-Way Manager and conducted a • <br />Polaczyk said e g � Y g <br />field tour to revisit the right -of -way costs. The right -of -way cost estimate has been <br />reduced from $100,000 to approximately $65,000 to $70,000. This does not include any <br />credit for the pond The reduction is due to the segment along the railroad track, which <br />is felt to be able to be acquired thru a clear zone easement. <br />Callahan asked if the Council agreed upon the range for the right -of -way costs, what step <br />would be taken next. Moorse said it would be recommended to the County to do the <br />next step in the design work. <br />Polaczyk said the Council adopted the resolution for the layout in May of 1995. The <br />County would like the Council to endorse the right -of -way costs and direct the County to <br />move forward with a detailed design. <br />Callahan noted that the costs were two to three times the amount the City has budgeted <br />for the right -of -way easements. <br />Jabbour said the resolution regarding the road project was contingent on the right -of -way <br />costs not being excessive. The Council needs to determine if the projected costs are <br />excessive. <br />Kelley asked if the City would receive money for the pond area acquisition. Jabbour said • <br />the City would continue to own the property but it would be used as a pond and be a <br />mitigation area. <br />Polaczyk said he would meet with Gerhardson and the environmentalist to determine if <br />the area can be used for wetland mitigation. Any roadway affecting wetlands has to be <br />mitigated according to law. Polaczyk said he was unsure how much wetland would be <br />impacted, and it would be the next step to determine this. <br />Callahan asked if the Council agreed to a certain right -of -way cost ceiling, would the <br />County be comfortable with moving ahead. Polaczyk said he was not comfortable with <br />lowering the cost for right -of -way any further as it is felt the projected costs have already <br />been fine tuned. <br />Jabbour asked Polaczyk if the pond area was to be taken into consideration. Polaczyk <br />said he was not well versed on this, and another field tour would be required. It was <br />questioned how much of the land could be converted to wetland since it was marshy to <br />begin with. Kelley asked who would make the determination and would like to hold to <br />the $30,000 cost. <br />C� <br />J <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.