My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-1995 Council Minutes
Orono
>
City Council
>
1995
>
08-28-1995 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 9:42:49 AM
Creation date
4/25/2019 9:42:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON AUGUST 28, 1995 <br />( #14 - County Road 15 Project, Orono Orchard and East - Continued) <br />• Hurr noted that the project does not serve the residents of Orono only. <br />• <br />Jabbour questioned why Wayzata will not incur any costs with the project in their area. <br />Polyczyk said the staff has a participation cost policy, and Wayzata would incur costs of <br />their own. The construction cost would be paid by the County, the same as Orono, but <br />Wayzata would still be responsible for the right -of -way costs. <br />Callahan suggested that the recovery area all be changed to suburban. Hurr and Callahan <br />noted that the area is not developed only because it is wetlands and undevelopable. <br />Polyczyk said the character of the road does change in the area mentioned. <br />The utility lines were considered. It was suggested to move the wires outside of the clear <br />zone. Kelley questioned if there was enough room to do this. Hurr said only 3' is <br />required. Callahan suggested putting the lines on the south side which the County said <br />could be done. The idea of burying wires underground was mentioned but said to be <br />expensive. The County does not have any mechanism for this in their cost policy. <br />The County representative was asked if the road would remain partially opened during <br />construction or closed. This will be decided with the City but work can best be <br />accomplished if the road is closed. Kelley asked if the work would need to be done in the <br />winter months due to the wetlands involved. It was said that the area would be wet and <br />soggy even during the winter months. Kelley suggested keeping one lane open and be <br />reversible depending on the time of day. <br />Jabbour asked if a floating road could be done. The County representative said this was <br />an option. <br />Gerhardson asked that the County check with Mn/DOT regarding the recovery areas. <br />Goetten said she would insist that a legal access be provided for her lakeshore property <br />which is currently shown without one. <br />The County was asked to see if costs could be reduced and/or offset by the City <br />providing wetland mitigation. <br />The County representative said the funding was 1995 for this project has been rolled over <br />to 1996 and will continue to be carried forward as conversation continues with the City. <br />The County would like the schedule for this project to satisfy both the County and City. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.