My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-1995 Council Minutes
Orono
>
City Council
>
1995
>
08-28-1995 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 9:42:49 AM
Creation date
4/25/2019 9:42:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON AUGUST 28, 1995 <br />CITY ADMINISTRATOR'S REPORT <br />• 410 ESTABLISHING RENEWAL DATES FOR SELECTED LICENSES - <br />ORDINANCE AMENDMENT #140, 2ND SERIES <br />Goetten moved, Kelley seconded, to adopt Ordinance 9140, Second Series establishing <br />expiration dates for selected licenses. Ayes 4, Nays 0. <br />( * #11) 1996 CITY ASSESSOR CONTRACT <br />Goetten moved, Kelley seconded, to approve the 1996 assessment contract with Rolf <br />Erickson for a total cost increase of $2,113 or 2.8 %. The increase is made up of a 2.15% <br />increase in the assessment contract amount (to $76,500) and an increase of $500.00 for <br />miscellaneous expenses. Ayes 4, Nays 0. <br />( #12) SET DATE & TIME FOR JOINT WORK SESSION <br />The Joint Work Session is scheduled for Thursday, October 12, 1995 at 8:00 a.m. <br />( #13) COUNTY ROAD 15 AT BRACKETTS POINT CURVE: ROAD <br />MAINTENANCE/REHABILITATION OPTIONS <br />Hennepin County representative, Bruce Polycyzk, reported on the options available <br />• concerning the Bracketts Point Curve section of County Road 15. One option is an <br />overlay on the existing pavement as a maintenance project with a life of about 15 years. <br />The other option is a reconstruction of the road section with widening of the curve area. <br />A design alternative has been drawn to keep the new pavement within the right -of -way to <br />limit the impact on adjacent properties. Temporary easements would be needed for some <br />work and retaining walls, both of which would incur costs to the City. The County is <br />presently doing overlays on CoRd 15 in Minnetonka Beach and would like to continue <br />with the road work in Orono when the current project is completed. <br />n <br />�J <br />Polycyzk said the design will soften the curve away from the lake and will still be within <br />the right -of -way. An exclusive left turn lane will be introduced into Bracketts Point <br />taking traffic out of the main line. <br />Several impacts were noted. Retaining walls will need to be removed and reconstructed. <br />It is possible that Native American burial mounds are located within the area. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.