Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON AUGUST 14,1995 <br />( #7 - Doug Olson - Continued) <br />The application is for removal of existing concrete patio and replaced with interlocking <br />blocks in sand resulting in 65 s.f less hardcover. The applicant would like to maintain <br />the walkway to the dock. The Planning Commission recommended approval of the <br />proposal by 3 of 4 total votes. The one Commissioner felt the stepping pads to the dock <br />were not needed. Mabusth noted that the property is 24' from the 929.4' elevation <br />requiring a setback variance for the replacement. The application involves replacement of <br />non - structural for non - structural with 170 s.f smaller area. The decking width is 9' and <br />remains the same. <br />Dr. Olson said there has been talk of remodeling. The goal now is for repair and time to <br />see how it works. Olson asked the stepping stones remain to the dock due to the large <br />goose population. <br />Jabbour said he appreciated the hardcover removal that has taken place and asked for <br />consideration in the car parking area. <br />Hurr inquired of the two docks. One dock is used for the boat with canopy in the lagoon <br />area. The other 15' dock is the swimming area. <br />Kelley moved, Goetten seconded, to approve Resolution #3 589. <br />• Callahan remarked on the variance based on a possible remodeling when that may not <br />occur. The City may re- evaluate the paving when further changes are made. Olson <br />responded that he would like to change the blacktop area but needed to see whether the <br />house was a good fit for his family. Ayes 5, Nays 0. <br />40 <br />MAYOR/COUNCIL REPORT <br />Hun left the meeting at this time. <br />Jabbour reported on the LMCD meetings recently attended. Moorse had presented <br />Orono's concerns to the LMCD regarding their budget. No questions were answered as <br />no board members with detailed knowledge of the budget were in attendance. <br />Harvesting of eurasian milfoil was discussed but to no further conclusion. <br />ENGINEER REPORT <br />(x#8) CHANGE ORDER A (COMPLETION DATE) LIFT STATION #7 <br />Goetten moved, Hurr seconded, to approve the Change Order #1 for Lift Station #7, <br />which extends the completion date of the project to October 31, 1995. Ayes 5, Nays 0. <br />7 <br />