My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-1995 Council Minutes
Orono
>
City Council
>
Minutes
>
1990-1999
>
1995
>
05-08-1995 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 9:26:18 AM
Creation date
4/25/2019 9:26:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON MAY 8, 1995 <br />• ( #9) #2011 TIM AND LORIE LINE, 4415 FOREST LAKE LANDING - <br />VARIANCES - RESOLUTION #3559 <br />Architect, Blake Bichanich, represented the applicants. <br />Mabusth reported that this property was reviewed for a height variance in 1993. The <br />height variance needed for this application is for an observation tower. Drainage <br />treatment area is located in the west yard and will treat 20% of 291/6 hardcover. <br />The original application proposed 32% of hardcover in the 75 -250' zone. After more <br />detailed surveying was completed, an additional 7000 s.f was added to the total area in <br />the 75 -250' zone, which reduced hardcover to 29.4 %. <br />Neighbors had been concerned with tree removal. The height of the house wi11 be at the <br />tree line. The dock will be located at the east shoreline rather than the south shoreline <br />because of the wetlands. <br />The Planning Commission had no problem with the 5' height variance. Architect <br />Bichanich had explained to those members as well as the Council that if the main <br />structure was more massive, no height variance would be required. Mabusth noted the <br />conservation of use of structural hardcover with the stacking of lower level terrace, <br />• veranda and upper level deck. <br />• <br />Kelley verified that the hardcover variance in the 75' -250' was 4.29% in the current <br />application compared to 7.9% in 1993. <br />Mabusth commented that this is an undeveloped property and the five parcels that make <br />up the total property must be combined. <br />Hurr asked why there would be a hardcover variance hardship with the large size of the <br />lot of 62,000 sq. ft. The peninsula shape of the lot causes a large portion of the lot to be <br />located in the 0 -75' zone. The portion of the structure which would normally be outside <br />this zone is, thus, within the zone. It was noted that the main floor square footage will be <br />2472. The roof overhang, which is 6 inches, is included within the setback. <br />Jabbour moved, KeIlley seconded, to approve Resolution #3559, with the stipulation that <br />no permit for an accessory dock be given until the permit of occupancy has been granted. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).