Laserfiche WebLink
N.d <br /> s <br /> �✓73� � CITY OF ORONO <br /> SEPTIC SYSTEM APPROVAL <br /> CITY of ORONO <br /> M1ttuticipal Otr'Kcs <br /> `� `�',✓� ti�l�.a� G~ Post OPrke Box 66 <br /> Crystal Bay,Minnesota 55323-0066 <br /> sl <br /> LOCATION: 2643 Thoroughbred Ln. <br /> O' NER: <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S–P Testing REPORT DATE:May 12 , 1996 <br /> The City of Orono has Approved your on-site system design as of February 9, 1996 <br /> (approved-disapproved) (date) <br /> With the fo'lowing cornments: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NO'rICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF 0 <br /> By �— <br /> Stephen e kinan,6 n-site Systems Manager <br /> TELEP: <br />