My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009688 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2605 Thoroughbred Lane - 04-117-23-11-0022
>
Septic
>
1997-009688 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:39 PM
Creation date
4/24/2019 9:27:42 AM
Metadata
Fields
Template:
x Address Old
House Number
2605
Street Name
Thoroughbred
Street Type
Lane
Address
2605 Thoroughbred La
Document Type
Septic
PIN
0411723110022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M F-17 <br /> PUMP SELECTION PROCEDURE <br /> END PERFORATION OF A PERFORATED LATERAL <br /> A- Determine pump capacity: c...r.... <br /> Gravity Distribution TeoeW <br /> 1. Minimum suggested is 600 gallons per hour 00 gpiry to stay ahead of e,w.»,,»Palk(WNv <br /> water use rate. `L-W S&W neper '=.4., <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 M»No.CAP=qn IT""enm�eih <br /> eep <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. ..e,,.A»w -- -01 «e Edg. <br /> Pressure Distibution C»ee SOW L"W ee"M of L.#_1 <br /> 3.a. Select number of perforated laterals 3 <br /> b. Select perforation spacing= a_feet `SO- So yw <br /> C. Subttra;t 2 ft from the rock layer length. <br /> -� -2 ft._ '1 3 feet <br /> d. Determine the number of spaces between perforations. <br /> Length perf.spacing= 'L-5L ft.-t-_ZL__ft._Zk 4_spaces Required Perforation D;sch e <br /> e. �spaces+1=�,'�,perforations/lateral in gallons Per minute(gp.,> <br /> f. Multiply perforations per lateral by number of laterals to -ase ;2 <br /> get <br /> �inch PM <br /> get total number of perforations. W.,,_, x-- Q,,_�5 perforations. (feet) <br /> g. U x '`"-&'gpM. 1.0a 0.56 0.74 <br /> SELECTED PUMP CAPACITY 4Z gpm 2.Ob 0.80 1.04 <br /> B.Determine head requirements: a.Use for single family homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other applications <br /> _ .< feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity stem,zero. <br /> 16 feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe Length <br /> Read friction loss in feet per 100 feet from table. Point of Discharc <br /> F.L.= 2,ie.' ft/100 ft of pipe TJoao <br /> b. Determine total pipe length from pump to discharge Elevation Difference l <br /> point Add 25 percent to pipe length for fitting pwn,p a a <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> /D O x 1.25= LIZ feet <br /> c. Calculate total friction loss b multiplying1.5 inch 2.0 inch 3.0 inch <br /> Y Sent Frict�=,a.a.,aonof pipe <br /> friction loss in ft/100 ft by equivalent ipe length. <br /> Total friction loss= 2.5� x 1 L j +100=_ feet 10 0.69 0.20 <br /> 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> +�_+ 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 0.39 <br /> TOTAL HEAD _feet 43- 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 1. A pump must be selected to deliver at least <br /> �D gpm (Step A)with at least j y, feet of total head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.