Laserfiche WebLink
� a <br /> Farr Construction ',Jt' <br /> 100 Bridge Avenue Licensed—Bonded-Insured <br /> Delano,MN 55328 <br /> (763)972,300 <br /> May 1, 2003 <br /> Mr. Steve Hankey <br /> Miller Brewing Company <br /> 2600 Thoroughbred Lane <br /> Long Lake, MN 55356 <br /> VIA CERTIFICATE OF MAILING <br /> Re: RESPONSE TO LETTER OF APRIL 18TH,2003 AND CONFIRMATION OF <br /> PREVIOUS DISCUSSION <br /> Mr. Hankey, <br /> As follows please regard our response in chronological order to your letter of April I e, <br /> 2003. <br /> 1. No soil on your property has been unearthed or removed. No soil from the entire <br /> jobsite was removed. <br /> 2. A small amount of tree roots may be left unexposed but they are not on your <br /> property and they are as a result of the concrete foundation that was removed. <br /> 3. The only dropping of tree limbs and branches on your property that required <br /> cleanup was more than likely due to your trimming your own trees with a chain <br /> saw on your property. <br /> 4. We didn't remove any of your trees, shrubs or thicket. <br /> 5. I am not aware of any tree bark that that has been removed, skinned and exposed. <br /> 6. The only tree limbs that I am aware of that have been torn off and left exposed are <br /> the ones that you cut with a chain saw. <br /> 7. Not one single shrub was broken on your property. <br /> 8. We did not utilize the ditch between your property and the road. <br /> 9. Duplicitous of item 3. <br /> Mr. Hankey, after speaking with Mr. Lyle Oman the City of Orono Building Inspector I <br /> contacted you to address your concerns about our work at the property adjacent to yours. <br /> I asked you to please furnish me with a copy of your survey so that I might come out and <br />