Laserfiche WebLink
ORONO REGULAR COUNCIL MEETING HELD OCTOBER 8, 1990 <br />ZONING FILE #1588 - US WEST NEW VECTOR GROUP CONTINUED <br />An objection was raised to having a tower in this <br />neighborhodd when it services someone driving by and not this <br />neighborhood. <br />Mr. Hellerman explained that this is to build out a system. <br />Cellular One and US West systems are not interchangeable. They <br />look for areas that will have the least impact possible but it is <br />not always possible to locate in commercial areas. Cells are <br />currently being located as little as .6 mile apart. They try to <br />"hide" the cells as much as possible. Churches and schools are <br />not residential per se but may exist in residential areas and may <br />provide a spot for the system. They do need to exist within a <br />grid or framework and these spots help in residential areas. <br />Goetten asked, "Would you step back if you feel you are <br />creating difficulty for the community ?" . <br />Hellerman answered, "If you will help us to find a site that <br />meets the engineering criteria that we have to deal with and <br />recognizing that we have a site in Wayzata. We'll have another <br />site in Long Lake. We'll have another site south and a site in <br />Medina. We've got sites around here. We can't move the site a <br />mile to the east or west or north because it interferes with <br />other sites. As the system continues to grow out, we'll <br />continually need to get more and more sites. Hopefully, we will <br />be able to locate some of those sites in commercial industial • <br />areas. Right now the need is in the particular area we are <br />looking at." The search area is a relatively large area but the <br />available properties are a small number. <br />Peterson asked why this tower could not be placed somewhere <br />in close proximity to the Wayzata tower even though not on the <br />same site. <br />Hellerman answered that at some point they will have to be <br />in Orono and surrounding areas. Cellular One will be looking for <br />similar sites. <br />Callahan referred to the move to widen Highway 12 into #394 <br />and decide on corridors. No matter where these corridors run, <br />the starting point would be at the base of the proposed tower. <br />His feeling is that there should be a moratorium on any kind of <br />development on all land involved in this area until it is <br />determined where the highway will go and the corridor selected. <br />He suggests that the placement of the tower may not be in the <br />best location regarding this. <br />Acting Mayor Callahan suggests, in view of the fact of the <br />possible expansion of US West and Cellular One and that the <br />zoning code is not organized in dealing with tower, that an <br />interim moratorium be placed in effect on the granting of • <br />building permits, land subdivisions, rezoning applications, -and <br />other things relating to the siting of wireless telecommunication <br />27 <br />