My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-008188 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2575 Thoroughbred Lane - 04-117-23-11-0021
>
Septic
>
1996-008188 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:27 PM
Creation date
4/23/2019 12:05:13 PM
Metadata
Fields
Template:
x Address Old
House Number
2575
Street Name
Thoroughbred
Street Type
Lane
Address
2575 Thoroughbred La
Document Type
Septic
PIN
0411723110021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s F-17 <br /> l PUMP SELECTION PROCEDURE <br /> EM PERFORATM OF A PERFORATED LATERAL <br /> A. Determine pump capacity. c...C~ <br /> Gravity Distribution rwg <br /> 1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of Faerk - <br /> (.k <br /> water use rate. '.`'an's"°`""` .0%rod,.oih pop.)^"�"'° <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 Vorter•lloo&NOW"orsvm^�h' <br /> &ft CAW f.r T.0 <br /> gallons per hour(45 gpm)to prevent build-up of pressure in.drop box. �; OW le to Ed" <br /> .f Sea LOW <br /> I "CIO <br /> Pressure Distibution amen ser LOW <br /> 3.a. Select number of perforated laterals _ <br /> b. Select perforation spacing=.-_feet <br /> c. Subtr 2 ft.from the rock layer length. <br /> -ms' s t. <br /> -z-2 ft._•(A to fee <br /> d. Determutethe number of spaces between perforations. <br /> Length perf.spacing= (ot,, ft.+-'L�ft.=3?spaces Required pfix tion e <br /> e. D spaces+1=. _perforations/lateral in pno-PQ-ut�(aP�+ <br /> f. Multiply perforations per lateral by number of laterals to 7 a'f e Head :`a''' 34, <br /> get total umber of perforations. a; x- - _1�perfo�a�ons. (� <br /> g' x Pd=-4-gpnL <br /> 1.0a - 0.74 <br /> SELECTED PUMP CAPACPTY 3!� -gpm 2.Ob 0.80 1.04 <br /> B.Determine head requirements: <br /> 1. Elevation difference between m and int of discharge. a.Use for single family homes <br /> �P P� ''Se• b.Use for all other applications <br /> feet <br /> \ 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravitysm <br /> te ,zero. <br /> feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe Length <br /> Read friction loss in feet per 100 feet from table. Point of Dinh e <br /> F.L. .(.e ft./100 ft of pipe ►DI�� <br /> b. Determine total pipe length from pump to discharge ©evation Difference <br /> point. Add 25 percent to pipe length for fitting p io tz <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length- <br /> _'Z�:x 1.25=O_feet F-18b <br /> 13 inch 2.0 inch ainch <br /> c. Calculate total friction lossby multiplying gpm r,kdwi« pw toonOf pipe <br /> friction loss in h/100 ft by equivalent pipe length. 10 0.69 0.20 <br /> Total friction loss= .1, 1. x 9_+100- Z feet '12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> +5_+ a 25 3.73 1.11 0.16 <br /> (1) (2) (30 30 5.23 135 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 0.39 <br /> TOTAL HEAD _I feet 45 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> C. Pump selection 6o 5.60 0.82 <br /> 1. A pump must be selected to deliver at least <br /> -34)_gpm (Step A)with at least )Z feet of total head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.