My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009687 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
ne (2)
>
Septic
>
1997-009687 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:08 PM
Creation date
4/22/2019 1:43:56 PM
Metadata
Fields
Template:
x Address Old
House Number
2520
Street Name
Thoroughbred
Street Type
Lane
Address
2520 Thoroughbred La
Document Type
Septic
PIN
0411723110015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. DOWNSLOPE DIKE WIDTH <br /> 1. If landslope is 2.9 % or less adsorption width inculdes both upslope and <br /> downslope widths <br /> 2. Calculate Minimum mound size bsaed on geometery: <br /> a. Determine depth of clean sand fill at upslope edge of rock layer: <br /> Separation /, y feet <br /> b. Multiply rock layer width by landslope 1 feet corer <br /> to determine drop in elevation; 1 f eo t R e ed <br /> Slope Difference SeDeretlon feet <br /> x -% + 100 = feet Slope Difference �_ et <br /> Upslope Width <br /> c. Add depth of clean sand for separation (2a) feet <br /> Rock Bed Width <br /> at upslope edge, depth of rock layer (1 foot) to feet Downslope width <br /> depth of cover (1 foot) to find the mound height at the feet <br /> upslope edge of rock layer; ),0 ft + Ift + 1 f=Z feet <br /> d. Enter table with landslope and upslope dike ratio. a-� t I =� y ' snolN 4 P W <br /> Select dike multiplier of H <br /> e. Multiply dike multiplier by upslope mound height to find <br /> upslope dike width: �_x H _= 1-,-4- feet QRST SO4-C�4 -4 *4 _1b <br /> f. Add depth of clean sand for slope difference (2b) at downslope edge, to <br /> the mound height at the upslope edge of rock layer (20 to find the <br /> downslope height; - it__+- -- ft = feet <br /> g. Enter table with landslope and downslope dike ratio. <br /> Select dike multiplier of �---- <br /> h. Multiply dike multiplier by downslope mound height to get <br /> downslope dike width: feet <br /> i. Minimum mound width is the sum of upslope dike width plus rock <br /> layer width plus downslope dike width; <br /> ---_..ft- feet <br /> upslope W1atn <br /> j. Subtract the minimum width (2.i) from the f.a <br /> _ ... <br /> adsorption area (F.4) to find the additional i ROCK Bid Width . <br /> downslope area for adsorption L P,1& `°°` <br /> [ Upslope W1dtn UDs1oDe Width <br /> feet 3 feet feet <br /> k. Add the additional width (2.j ) to the <br /> I Li ID+ downsolpe width and recalculate So oowoslcp.Wiotn <br /> �.Z the total width E r.a <br /> 1Z ft + eft + �-�ft = 39 feetV4� f <br /> E <br /> 1. Total mound length is the sum of <br /> upslope dike width plus rock layer length <br /> plus upslope dike width: Tote, length <br /> 1Z ft+ 1,,eft + 11,,_ ftfeet <br /> Downslope UPSIOPe <br /> 3:1 4:1 5:1 61 7:1 3:1 4:1 5:1 6:1 7:1 8:1 <br /> %dope <br /> 0 3.0 4.0 5.0 6.0 7.0 3.0 4.0 5.0 6.0 7.0 8.0 <br /> 1 3.09 4.17 51b 6.36 7-53 291 3.85 4.76 5.66 654 7.41 <br /> 2 3.19 435 556 6.82 8.14 2.83 3.70 454 536 6.14 6.90 <br /> 3 330 454 5.88 732 6.86 2.75 3.57 435 5.06 5.79 6.45 <br /> 4 3A1 4.76 615 7.89 9.72 2.68 3.45 4.17 4.84 5.46 6.06 <br /> 5 3S3 5.00 667 857 1077 2.61 333 4.00 4.62 5.19 5.71 <br /> 6 3.66 5.26 7.14 938 12.07 254 3.23 3.85 4.41 4.93 5.41 <br /> 7 3.0 556 7.69 1034 1373 2.48 3.12 3.70 4-23 4.70 5.13 <br /> 13.95 5.88 833 1154 15.91 2.42 3.03 357 4.05 4.49 4M <br /> 9 4.11 6.25 9.09 13.04 18.92 2.36 2.94 3.45 3.90 430 4.65 <br /> 10 429 667 10.0 15.00 2333 231 2.86 333 3.75 4.12 4.44 <br /> 11 4A8 7.14 11.11 17b5 30.43 226 2.78 323 3.61 3.95 426 <br /> 12 4.69 7.69 1250 21.43 43.75 2.21 2.70 3.12 3.49 3.80 4.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.