My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-008155 - new septic
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
ne
>
Septic
>
1996-008155 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:21 PM
Creation date
4/22/2019 1:04:34 PM
Metadata
Fields
Template:
x Address Old
House Number
2485
Street Name
Thoroughbred
Street Type
Lane
Address
2485 Thoroughbred La
Document Type
Septic
PIN
0411723110019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• F-17 <br /> PUMP SELECTION PROCEDURE <br /> END PERFORATION OF A PERFORATED LATERAL <br /> A. Determine pump capacity: I C.-e C-- <br /> Gravity Distribution K T"-U <br /> 1. Minimum suggested is 600 gallons r hour(10 m)to stay ahead of _ }� <br /> gt� g l� ,. <br /> OC y d GaeNnIN FaMlc<or water use use rate. Nie LO0"'► °Ior.. wort ng g•eo Yn papr)Mr arse•w.e <br /> ' <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 Perlere�an mows H-a 1.11Y <br /> Inb cao H- T" <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. R«: Ike sea. <br /> :.. W <br /> PerfarelN-Lasted <br /> at <br /> Pressure Distibution view sat"Late, a." .t LAMM <br /> 3.a. Select number of perforated laterals <br /> b. Select perforation spacing= _feet. �Pk So4 L.'W <br /> C. Sub'tra�2 ft.from the rock layer length. <br /> -2 ft.=• (g Lg feet. <br /> d. Determine the number of spaces between perforations. <br /> Length perf.spacing= !�1 ft.+ ft.= 22 spaces Required Perforation Discharge <br /> e. spaces+1= a perforations/lateral in gallons Per minute(gpmj <br /> f. Multiply perforations lateral by number of laterals to 7/ Z" D e Z�� 34' <br /> �� <br /> get totallumber of orations. >,taala x I? =1�perfo a ons. (feet) <br /> g. x SPmi Ped c2�-gpm. <br /> 1.0a <6 0.74 <br /> SELECTED PUMP CAPACITY 3!�-gpm 2.Ob 0.80 1.04 <br /> B.Determine head requirements- a.Use for single family homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other applications <br /> U feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity s stem,zero. <br /> feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe Length <br /> Read friction loss in feet per 100 feet from table. Point of Discharge <br /> F.L.= a,to ft./100 ft of pipe TTtDi <br /> b. Determine total pipe length from pump to discharge Elevation Difference) <br /> point. Add 25 percent to pipe length for fitting PUMP <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> I -r_x 1.25= f)j -feet <br /> 1-5 inch 2.0 inch 3.0 inch <br /> c. Calculate total friction loss by multiplying Urn Bitot lau ptr loo n of Pipe <br /> friction loss in ft/100 ft by equivalent pipe length. 10 0.69 0.20 <br /> Total friction loss= ), (., x'_+100= Z feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> + _+ 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 0.39 <br /> TOTAL HEAD feet 45 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> G Pump selection 60 5.60 0.82 <br /> i <br /> 1. A pump must be selected to deliver at least <br /> J <br /> 3c) (Step A)with at least 13 feet of total head(Step B). <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.