My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009024 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2430 Thoroughbred Lane - 04-117-23-11-0013
>
Septic
>
1997-009024 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:00 PM
Creation date
4/22/2019 11:11:53 AM
Metadata
Fields
Template:
x Address Old
House Number
2430
Street Name
Thoroughbred
Street Type
Lane
Address
2430 Thoroughbred La
Document Type
Septic
PIN
0411723110013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. DOWNSLOPE DIKE WIDTH <br /> 1. If landslope is 2.9 % or less adsorption width inculdes both upslope and <br /> downslope widths <br /> 2. Calculate Minimum mound size bsaed on geometery: <br /> a. Determine depth of clean sand fill at upslope edge of rock layer: <br /> Separation ';.D feet <br /> b. Multiply rock layer width by landslope r feet t:over <br /> to determine drop in elevation; = 1 foot Ro ee <br /> Slope Difference Seperetloo feet I <br /> x -- %1100 = feet Slop• Dlfterenee <br /> -" � UDs1oDe Width <br /> c. Add depth of dean sand for separation (2a) -«feet Rock Bed Width <br /> atupslope edge,depth of rock layer (1 foot) to �feet Downslope Width <br /> depth of cover(1 foot) to find the mound height at the feet <br /> upslope edge of rock layer; 'a.0 ft+ 1ft+ 1ft= L�- _feet <br /> d. Enter table with landslope and upslope dike ratio. <br /> Select dike multiplier of L4 <br /> e. Multiply dike multiplier by upslope mound height to find <br /> upslope dike width: _x __ I L feet <br /> f. Add depth of dean sand for slope difference(2b)at downslope edge, to <br /> the mound height at the upslope edge of rock layer(20 to find the <br /> downslope height; -- ---feet <br /> g. Enter table with landslope and downslope dike ratio. <br /> Select dike multiplier of <br /> h. Multiply dike multiplier by downslope mound height to get <br /> downslope dike width: ---x- = feet <br /> i. Minimum mound width is the sum of upslope dike width plus rock <br /> layer width plus downslope dike width; <br /> ft+ ft + ft= feet <br /> Upslope Nlolh <br /> j. Subtract the minimum width (21) from the red <br /> adsorption area (F.4) to find the additional <br /> Rotk Dee WIOtn <br /> downslope area for adsorption - <br /> feet <br /> � I upslope W10tn UDs10pe 1{'loln <br /> _.f f_n_=-ft----__.___ feet 3 -Lf?feet 11�L feet <br /> k. Add the additional width (2.j ) to the `� `l <br /> downsolpe width and recalculate f Downslope width <br /> the total width <br /> )ift+)pft + tft= 4 Z feet <br /> 1. Total mound length is the sum of <br /> upslope dike width plus rock layer length 1 _ <br /> Plus upslope dike width: Total Len <br /> gth <br /> /Ie ft+1,<eft+ ),�,_ft = ov feet <br /> owns ope Lpslope <br /> 3:1 4:1 5:1 6:1 7:1 3:1 4:1 5:1 6:1 7.1 8:1 <br /> A siopr <br /> 0 3.0 4.0 5.0 6.0 7.0 3.0 4.0 5.0 6.0 7.0 8.0 <br /> I 3A9 4.17 516 6.36 7.53 291 3.95 4.76 5.66 654 7AI <br /> 2 3.19 435 556 6.82 8.14 283 3.70 454 536 6.14 6.90 <br /> 3 330 454 5.88 7.32 8.86 275 35, 435 5.06 5.79 6.45 <br /> 4 3AI 4.76 625 7.89 9.72 2.68 3.45 4.17 4.84 5.46 6.06 <br /> 5 353 5.00 667 857 107 261 333 4.00 4.62 5.19 sm <br /> 6 366 5.26 7.14 938 1207 254 313 3.85 4.41 4.93 SAI <br /> 3b0 556 7.69 1033 1373 248 3.12 3.70 423 4.70 5.13 <br /> 8 3.95 5.88 633 1154 15.91 232 3.03 3.57 4.05 4.49 4.88 <br /> 9 4.11 625 9.09 13A4 1&92 236 294 3.45 3.90 430 4.65 <br /> 10 429 6.67 10.0 15.00 2333 2.31 286 333 3.75 4.12 4A4 <br /> 11 4A8 7.14 11.11 1765 30.43 2.26 278 323 3.61 3.95 426 <br /> 12 469 7.69 1250 21.43 43.75 2.21 2.7c 3.12 3.49 3.80 4.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.