Laserfiche WebLink
CITY OF ORONO 0 <br /> Municipal Offices O O <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323-0066 ON—SITE SEWAGE TREATMENT <br /> INSPECTION REPORT <br /> �9kEsH0 <br /> Owner: Address: <br /> Permit #'s: 5a6gn Dates: ��k/-/ Contractors: <br /> City ordinance number 100 requires that each on-site sewage treatment system in Orono be inspected on a regular basis. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the category <br /> checked below. <br /> (This is A an existing system [ ) new construction) <br /> SYSTEM CONFORMITY (1-3): <br /> 1 "CODE SYSTEM"-A system which meets all the Location, design, and construction standards of the current City <br /> Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input <br /> without discharging any pollutants into ground or surface waters. <br /> 2 "CONFORMING SYSTEM"-A system which does not meet all the location, design, and construction standards of the <br /> current City Codes, but was installed according to the code in effect at the time of installation, and which <br /> is operating satisfactorily by treating and disposing of the entire current sewage input without discharging <br /> /4 any pollutants into ground or surface waters. <br /> "NON-CONFORMING SYSTEM"-A prohibited system; a system located within a designated 100-year floodptain; any <br /> system which may or may not meet all the Location, design, and construction standards of the current City <br /> Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand <br /> between the distribution device and the Limiting soil characteristics. <br /> (The limiting soil characteristic ( I has oras not been identified at this time. If the limiting soil <br /> .Kalificationcharacteristic has not been identified, thismay be subject to revision.) <br /> TANK CONDITION (5-10): <br /> Tpw� inspection indicates: <br /> (5� Pumpout not needed at this time. <br /> `�d Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems. <br /> 7 Solids accumulation in tanks is at a critical Level. Tanks should be pumped out as soon as possible. <br /> 8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. <br /> 9 Inspection risers missing-tanks could not be inspected. Inspection risers (41, dia. pipe) must be installed to each <br /> tank at next punpout. If tanks have not been pumped out within the last three years, they should be pumped <br /> out now. <br /> 10 Inspection pipe is located directly over tank baffle (does not give accurate measurement of solids accumulation). <br /> If tanks have not been pumped out within the last three years, they should be pumped out now. <br /> DRAINFIELD CONDITION (11-14): <br /> Drainfield inspection indicates: <br /> 11 Drainfield is dry, no surfacing evident. <br /> 1� Some evidence of surfacing, not critical yet. <br /> 131 Drainfield is saturated and visibly discharging uen ace. Contact the City Inspector <br /> 1111111m) in 90 days. <br /> 14 Drain a ex en �a co <br /> LIMITING SITE FACTORS (slope.setbacks.etc.): <br /> POTENTIAL FOR SYSTEM FAILURE (depends on soils,water table.etc.): <br /> COMMENTS: <br /> *J�ile, lLank,�� 04wi <br /> Date of Inspection S*—pt#b System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of <br /> property, be advised that this report does not guarantee or certify that an existing system will continue to function <br /> properly, but is merely an opinion of the adequacy of the system under current conditions based on the available <br /> information. <br /> This report must be kept on the premises with the system location and pumping records. <br /> WHITE COPY/Inspectors File YELLOW COPY/Homeowner <br />