My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010378 - mechanical
Orono
>
Property Files
>
Street Address
>
T
>
Tamarack Dr
>
1050 Tamarack Dr - 26-118-23-42-0006
>
Permits/Inspections
>
1998-010378 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:51 PM
Creation date
4/16/2019 10:49:33 AM
Metadata
Fields
Template:
Address
House Number
1050
Street Name
Tamarack
Street Type
Drive
Address
1050 Tamarack Drive
Document Type
Permits/Inspections
PIN
2611823420006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WOOD BURNING EQUIPMENT <br /> Wood stove with flue <br /> Wood combination or add-on <br /> Factory fireplace with flue <br /> Factory Fireplace (s) Freestanding Masonry <br /> Wood Stove (s) Franklin, other <br /> Brand Name Model No. <br /> Mfgr's Min., Clearances, side rear min. flue dia. <br /> VENTILATION <br /> No. Kitchen Exhaust ducted recirculating cfm <br /> No. Bath Exhaust (must be ducted outside) cfm <br /> No. Other Fans: Locations cfm <br /> FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) <br /> Installation Removal <br /> Fuel oil: gallons underground inside outside <br /> LP Gas: gallons <br /> Other Gas opening <br /> PERMIT FEE CALCULATION <br /> 1. 1.25% of Contract Price* or Minimum Fee ($35.00) S� <br /> I �_> > "_- x .0125 $ <br /> (contract price) <br /> 2. State Surcharge. ** Add the State Building Code Division s <br /> Surcharge to each permit. CV Z7 � x .0005 $ <br /> or $.50, whichever is greater (contract price) <br /> 3. Postage and Handling (Only mail-in applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ <br /> * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted <br /> work including materials, labor, profit, and other fixed costs. It is the amount to be charged to the <br /> customer for the work done. Tf any material, equipment, labor, or installation-are fiunisbetl by the owner; <br /> tenant or any other party the reasonable market value of such items must be added to the estimated cost <br /> or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, <br /> the City may request the submission of a signed copy of the actual contract. <br /> ** The STATE SURCHARGE is .0005 of the contract price under $1,000,000 or $.50 - whichever is <br /> greater. For valuations over $1,000,000 call the Department of Inspectional Services for the price. <br /> The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the Minnesota <br /> State Building Code, and certifies that all statements made on this application are complete, true <br /> and correct. <br /> Applicant's Signature: Date: S S � <br /> Approved B Date: y� v <br /> PP Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.