My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dellneation reports-2011-2013
Orono
>
Property Files
>
Street Address
>
T
>
Tamarack Drive
>
1050 Tamarack Drive - 26-118-23-42-0006
>
Misc
>
Dellneation reports-2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:52 PM
Creation date
4/16/2019 10:09:28 AM
Metadata
Fields
Template:
x Address Old
House Number
1050
Street Name
Tamarack
Street Type
Drive
Address
1050 Tamarack Drive
Document Type
Misc
PIN
2611823420006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Buffer Vegetation Management Plan <br /> Spring Hill Golf Club <br /> Orono, Minnesota <br /> The goal for the Buffer Vegetation Management Plan is to establish three areas <br /> of native buffer along the edges of the fill areas on the 13th hole. The site <br /> preparation, invasive species control methods and monitoring/reporting <br /> requirements are outlined below. <br /> Wetland Buffer Planting Plan <br /> i <br /> I. Site Preparation <br /> A. Site Preparation shall consist of the following: <br /> L Preparation of the seedbed in a manner that prepares <br /> the project site for seed. After final grading has been <br /> ' completed, the site will be cultivated with a light disking <br /> and dragging so that the surface is relatively level, flat <br /> and not overly compacted. <br /> ii. Install seed according to specifications after seedbed is <br /> prepared. <br /> II. Seed Specifications <br /> A. Use native seed: fresh, clean, dry new-crop seed complying with <br /> the Association of Official Seed Analysts' "Rules for Testing Seeds" <br /> for purity and germination tolerances. <br /> B. Seed mixes shall be blended by the Contractor using the specified <br /> species and ratios as per BWSR Mix 35-641 in the upland buffer <br /> (seed specs attached). Seed mix species and ratios shall be <br /> guaranteed by the contractor to be true to specifications as <br /> required. The contractor shall supply and plant native seed as pure <br /> ' live seed (PLS). See planting plan for planting schedule. All seed <br /> shall have the proper stratification and/or scarification to break <br /> dormancy for spring planting. No treatment required for seed used <br /> in summer and fall plantings. <br /> C. Seed source shall be from an approved/licensed nursery that will <br /> be required to specify the origin of the seed used at the site. <br /> III. Seeding Protocol (includes Wetland and Upland Buffer Areas) <br /> A. Fall seeding shall occur between mid October and mid November. <br /> ' Spring seeding shall occur between May 1 and June 15. Seed may <br /> be hand-broadcast or planted using a properly calibrated seed drill <br /> over the site at the rates and with the species mix identified. After <br />
The URL can be used to link to this page
Your browser does not support the video tag.