My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. MOUND DIMENSIONS <br /> (----- <br /> Upstope 14.01 9.8 <br /> Endslape 14.L11 ' r IEndsto•e 14.L) <br /> i <br /> v 15.2 10.0 63.0 `" 15.2; <br /> c <br /> 250 <br /> 76. . Downslope (4.J) <br /> Total Mound Length (4.N) 93.3 <br /> 4" inspection pipe <br /> 18" cover on top 25.0 <br /> Upstope berm (4.D) r Downslope berm (4.J) <br /> 9.8 <br /> -----,- • \.Olt . 12" cover on sides <br /> (6" topsoil) <br /> Clear sans lift )4.,41 2.0 �.-,. <br /> 1.o 1 <br /> IAbsorption Width (3.A) 1 <br /> Note: ' 26.0 <br /> For 0 to 1% stapes, Absorption Width is measured from the Bedequally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.