My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: March 1, 2019 -oO A V,O <br /> Date Application Considered as Complete: April 3, 2019 l <br /> 120-Day Review Period Expires: August 1, 2019 <br /> G> <br /> To: Chair Thiesse and Planning Commission Members likEsxo4�" <br /> Dustin Rief,City Administrator <br /> From: Jeremy Barnhart, Community Development Director <br /> Date: April 15, 2019 <br /> Subject: #LA19-000018,Chris and Rachel Bollis, 350 Stubbs Bay Road North, <br /> Preliminary Plat <br /> Public Hearing <br /> Application Summary: The applicant is requesting preliminary plat approval to split 10.21 acres <br /> into two buildable lots. <br /> Staff Recommendation: Planning Department Staff recommends approval, subject to <br /> conditions. Staff's analysis can be found on page 3. <br /> Background <br /> The project area was recently a portion of the Kintyre Preserve subdivision in 2015-2016. That <br /> subdivision was allowed to expire. The applicants now propose the splitting of 350 Stubbs Bay <br /> Road North into two buildable lots. There is currently one house on the property. Access will be <br /> provided via an existing outlot that meets the width requirements. <br /> The project area is 10.21 acres, including 4.69 acres of wetland. The delineations were approved <br /> last fall by the MCWD. Currently, access to the site is via a gravel driveway through the existing <br /> outlot. <br /> LOT ANALYSIS WORKSHEET <br /> Section 78-420- Lot Area/Width: <br /> Dry <br /> Gross Dry buildable Wetlands Frontage Frontage <br /> area Buildable requirement <br /> requirement (acres) (Feet) <br /> (acres) (acres) (Feet) <br /> (acres) <br /> Lot 1 2.44 2.03 2 0.41 367 200 <br /> 149 (200 <br /> Lot 2 7.77 3.49 2 4.28 adjusted) 200 <br /> Section 78-1403-Structural Building Coverage: <br /> Both lots are proposed to be larger than 2.0 acres, structural coverage does not apply. <br /> Section 78-1680 and 78-1700-Hardcover Calculations: <br /> The subject parcels are in the exempt tier and therefore are not restricted with respect to hardcover. <br />
The URL can be used to link to this page
Your browser does not support the video tag.