My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table of Contents <br /> 1.0 INTRODUCTION 1-1 <br /> 2.0 SITE DESCRIPTION 2-1 <br /> 2.1 Current Use of Adjoining Properties 2-1 <br /> 2.2 Physical Setting 2-2 <br /> 2.2.1 Topography 2-2 <br /> 2.2.2 Geology 2-2 <br /> 2.2.3 Hydrogeology 2-2 <br /> 3.0 PREVIOUS ENVIRONMENTAL REPORTS 3-1 <br /> 3.1 Phase II Environmental Site Assessment (esa), Howard Eisinger Property, <br /> 3245 West Wayzata Boulevard, Orono, MN. GME Consultants, Inc., April 13, 1999.3-1 <br /> 3.2 Drilling Investigation Report, Minnesota Department of Transportation <br /> (mndot), State Trunk Highway 12, Long Lake, MN. EnecoTech Midwest, Inc. October <br /> 9, 2002 3-1 <br /> 3.3 Phase I Environmental Site Assessment, Haugo Geotechnical Services, LLC, <br /> October 2014 3-2 <br /> 3.4 Soil borings Performed By Haugo Geotechncial Services, LLC and Test Pits by <br /> Lake West Excavating, LLC, 2014/2015 3-3 <br /> 3.5 Test Pit Sampling Data Report, Wenck Associates, Inc., June 2015 3-4 <br /> 3.6 Remedial Investigation Report, WEnck Associates, Inc., March 2019 3-5 <br /> 3.6.1 Soil Discussion 3-5 <br /> 3.6.2 Groundwater Discussion 3-6 <br /> 3.6.3 Soil Vapor Discussion 3-6 <br /> 4.0 RESPONSE ACTION PLAN 4-1 <br /> 4.1 Environmental Conditions to be Addressed (Site Conceptual Model) 4-1 <br /> 4.1.1 Soil-Human Health Pathway 4-1 <br /> 4.1.2 Soil Leaching Pathway 4-1 <br /> 4.1.3 Vapor Intrusion Pathway 4-1 <br /> 4.1.4 Groundwater Pathway 4-1 <br /> 4.2 Proposed Development 4-2 <br /> 4.3 General Project Tasks 4-2 <br /> 4.4 Response Action Objectives 4-3 <br /> 4.5 Action Levels 4-3 <br /> 4.5.1 Proposed Building Footprint Areas 4-3 <br /> 4.5.2 Utility Corridors 4-4 <br /> 4.5.3 Green Space 4-4 <br /> 4.5.4 Parking, Driveways and Sidewalks 4-4 <br /> 4.6 Sampling And Analytical Testing 4-4 <br /> 4.7 Vapor Mitigation 4-5 <br /> 5.0 CONSTRUCTION CONTINGENCY PLAN 5-1 <br /> 5.1 General 5-1 <br /> 5.2 Project Organization 5-1 <br /> 5.2.1 Current Property Owner and Planned Developer - Lakewest, LLC 5-1 <br /> 5.2.2 Owner's Environmental Consultant - Wenck Associates, Inc. 5-2 <br /> March 2019 i �ISS�WENCK <br /> \\woodbury-dc1\Woodbury\Technical\5503 Lake West\03-RAP\Eisinger Meadows RAP 032919.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.