Laserfiche WebLink
O 2010 RYAN ENO0031.03 <br /> GENERAL SWEPT REQUIREMENTS&NOTES: PART IV CONSTRUCTION ACTIVITY REQUIREMENTS FINAL STABILIZATION-PART IV.G Rya <br /> IDENTIFIEDTHE CONTRACTOR AND ALL SUBCONTRACTORS INVOLvED WITH A CONSTRUC7101/THAT DISTURBS SITE SOIL OR WHO IMPLEMENT INngineering <br /> TIVITY THE PERMITEE MUST IMPLEMENT THE SWPPP AND THE REQUIREMENTS OF THIS PART.THE THE CONTRACTOR MUST ENSURE FINAL ST.ILIZATION OF THE SITE ACCORDING WITH THE <br /> THE STORM WATER POLLUT.N PREVENTION AAA((SWPPP,MUST COMPLY WITH WWITHHTXON(NOT GENERAL w DAYS AAFTER N.G.rwu s.BILIZATONi IS MUST oR LANOOe,LIOP,,i TIE: Ris7 s <br /> REQUIREMENTS OF THE NATIONAL POLLUTION TEM NPGES) RELEVANT MANUFACTURER SPECIFICATIONS AND ACCEPTED ENGINEERING PRACTICES. WITHIN 7 DAYS AFTER SELLING THE SITE OR PORTION OF NE SITE TO ANOTHER PARTY A <br /> AGENCYGENERAL PERMIT DATED AUGUST 1,2013AL COPY OF THIS NOT/PERMIT MODIFICATION FORM MUST GO TO THE NEW OWNER THE <br /> GOVERNING HAVING JURISDICTION CONCERPAINR NING EROSIAGES ON AND SEOIMAND ANY EBTATOS EROSION PREVENTION PRACTICES-PART IV.B ER THAT <br /> fl655W.M 53I <br /> CONTROL, sPECI <br /> I RTEE(SI MUST PLAN FOR AND IMPLEMENT APPROPRIATE BMPS SUCSPECIFICALLY ADDRESS ANY REMAINING CONSTRUCTION ACTIVITY. Excelebr,MWater- <br /> 55331 <br /> H AS <br /> CONSTRUCTION PHASING.1..EGETATVE BUFFER STRIPS.HORL2ONTAL SLOPE GRADING. (952)221-3700 <br /> INSPECTION ANO MAINTENANCE OF PART IV.E AND OTHER CONSTRUCTION PRACT.S <br /> THAT MINIMIZE EROSION AS NECESSARY TO COMPLY WITH THIS PERMIT AND PROTECT <br /> CONSTRUCTION ACTIVITY INFORMATION: <br /> DELINEATED LEGS WITH FLLAGSSTAKES.TSIGNS,SILT FENCE ETC.)ON THE PROJECT SWPPP CONTACTS: <br /> PROJECT NAME:EISINGER Furs SITE BEFORE WORK BEGINS L.'''.""'B. <br /> PROJECT TYPE:MULTI FAMILY RESIDENTAL PROJECT LOCATION 3245 WAYZATA BOULEVARD,ORONO,MN 55558 3EROSION,BUT NO LATER THAN END OF THE NEXT WORK TAY WHEN EARTHWORM <br /> lR TOR awan.✓e e.r <br /> CUMLILATVE IMPERVIOUS5uRFACE TSSENAME <br /> ACTIVITIES WILL CEASE FOR AT LE.7 14 DAYS. NGUCRtE.w AGGPEGATEY STOCKPILES ADDRESS <br /> TOTAL SITE ACRES 23.18 ACRES STOCKPILES,DEMOLITION CONCRETE STOCKPRES. TNO <br /> STOCKPILES, <br /> SMIIAR SUR CONTACT IP ONE <br /> FACES N H 4+• <br /> NUMBER OF ACRES TO BE DISTURBED 72 ACRES CONSTRUCTED BASE COMPONENTS OF OS,PARKING LOTS AND 51 <br /> POST-CONSTRUCTION ACRES OF IMPERVIOUS SURFACE 3 s*TTEE(SI MUST SPRE-CONSTRUCTION ACRES OF IMPERVIOUS SURFACE 0.0 ACRES ARE EXEMPT FROM THIS TABILIZE ���° <br /> E NORMAL WETTED PERIMETER OF ANY N <br /> TOTAL NEW IMPERVIOUS SURFACE ARA 553 ACRES TEMPOARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROMoNNEg, <br /> ANY PORTON OF THE CONSTRUCTION SITE,OR DIVERTS WATER.OUND THE SITE. <br /> LAKE WEST DEVELOPMENT <br /> RECEIVING WATERS <br /> 111-1IN 200 LINE,FEET FROM THE <br /> GE,OR FR01.4 A PONT OF <br /> LAKE PROPERTY <br /> AMN 55345 SPECIALO TTIMPAIRED wAER. TO A ,FEET FTER TBE EISINGERMINNETDNNAME OF WATER NO YES COMPLETED SURFACE WATER. LGNNGTDABDRFLLZATION OF THE L.T 200 EwAER. <br /> DATES OF CONSTRUCTION SEDIMENT CONTROL PRACTICES-PART IV.0 CONTACT PEERS BOWL 95.2-65.3-1359 FLATS <br /> ESTIMATED COMPLETOFJ. 7,,/JIIM20 t TTEE(51 MUST EMPLOY SEDIMENT CONTROL PRACTICES AS NECESSARY TO <br /> MINIMIZE SEDIMENT FROM ENTERING FACE WATERS,INCLUDING CURB AND GUTTERSYSTEMS AND STORM SEWER WLETS. SOIL INFORMATION Oros,MN <br /> 2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON,L DOWN GRADIENT <br /> THE PERIME <br /> PART III STORMWATER DISCHARGE DESIGN REQUIREMENTSPERIMETERS AND BE LOCATED UPGRADIENT OF ANY BUFFER TER for <br /> SEDIMENT CONTROL PRACTICES MU.BE IN PLACE BEFORE ANY UPGRADIENT <br /> LANGgM <br /> STURBNG ACTTES BEGIN. N <br /> THESE PRACTICES SHALL REMNN PLACE UNTIL <br /> SWPPP IMPLEMENTATION RESPorvSIB LrtIES <br /> t. THE OWNER AND CONTRACTOR ARE CO..MIMES AS DENTFIED BY THE NPDES PERMIT FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WRXPMT N.G. .. <br /> 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON SITE IMPLEMENTATION OF THE S BEEPERMITTEE(S) <br /> ADJUSTEDSOR REMOVED TO ACCOMODATENSHORRTT.TTERMAPRACTICES <br /> T SS AOT AsvE LAIKEWEbT,LLC <br /> 3. THE CONTRACTOR SHALL PROVIDE PERSON KNOWLEDGEABLE At.EXPERIENCE0 IN TIE SHORT-TERA4 ACTIVITY HAS BEEN COMPLETED. <br /> APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL MPS AND OVERSEE <br /> . TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT <br /> ALL INSTALLATION ANLI MAINTENANCE ANNOT BE PLACED IN ANY NATURAL BUFFERS OR SURFACE WATERS. <br /> 4. THE CONTRACTOR SH,L PROVIDE ON,S)MEETING THETA TRTATON AINING REQUIREMENTS SWPPP CLEARING OR GRUBBING.OR P.SAGE OF VEHICLES.IMMECIATELY AFTER THE <br /> • AND CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS.OR <br /> OF THE NRDES PERMIT TO CONDUCT INSPECTON AND MAINTENANCE OF,L EROSION CONDUITS AND DRONES. <br /> PREVENTION AND SEDIMENT CONTROL BMPS IN ACCORDANCE NITH THE NTss ITTEENT)MUS INSTALL A VEHICLE TRACKING BNP TO MINwI3F THE TRACKOF THE PERMIT.ONE OF THESE INDPMUALS MUST BE AVAILABLE FOR AN ONSITE ,77717,AD <br /> asauL • <br /> OUT R <br /> OFSEDIMENT FROM THE CONSTRUCTON SITE. . .xm <br /> Sr* .. <br /> INSPECT.N WITHIN 72 HOURS UPON REMEST BY MP..THE CONTRACTOPROVIDE TRAINING AND DOCUMENTATION OF PERSONNEL TO INCLUDE, <br /> AIPERSONNEL ASSOCIATED WPM THE PROJECT THAT ARE REQUIRED TO BE INSPECTIONS AND MAINTENANCE-PART IV,E a°^ <br /> M <br /> 42 TRAINING NAME OF AND ENTITY THAT PROVIDED t nTE15�MUST ENSURE THAT A TRMNE D PERSON WILL ROUTINELY INSPECT TRAINED , °'`,. a"'°^T M <br /> DATES OF TRA THE PERM CONSTRUCTION SITE AT LEAST ONCE EVERY SEE <br /> N 71 DAYS DURING ACTIVE • <br /> THAN oS T <br /> HN.H RAR NFA NT J a•N <br /> TM N NG THE ENTRE <br /> 4.3. CONTENT OF RNNWC TIONA INCLUDING OF OF COVERAGE <br /> SOF FOR THE CONSTRUCT.ARS WTI 3 OURS AFTER RAINFALL EVE WO* <br /> S FOLLOWING FINAL STABILMATION ANDTERMINATION OF COVERAGE FOR THE PERMIT,THE INCHES NNHOURS. �"'- ....... Rte, <br /> OWNER SHALL FURNISH LONG TERM OPERATION AND MAINTENANCE OF THE PERMANENT 2 ,L INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTON MUS BE .. <br /> HIM tr.^Wmr <br /> STORM WATER MANAGEMENT SYSTEM RECORDED WITHIN 24 HOURS IN WRITING AND T1ESE RECORDS MUST BE RETAINS➢WITH <br /> THE SWPPP IN ACCORDANCE WITH PART III.E. <br /> RECORDS RETENTION-PART ILLS 3. THE PERMRTEE(SH.RE RESPONSIBLE FOR THE INSPECTION AND MMNTEANCE OF <br /> TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BAPS,AS WELL AS ALL I <br /> EROSION PREVENTION AND SEDIMENT CONTROL BMPSNTL ANOTHER PERMITTEE HAS <br /> THE SWPPP(ORIGINAL OR COPIES)INCLUDINGALL CHANGES TO R,AND INSPECTIONS AND m <br /> MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE OBTAINED COVERAGE UNDERTHIS PERMIT NACCCRDANCE WITH PART 11.0.13 OR THE <br /> PERMITTEE(SI WHO HASmAVi OPERATIONAL CONTROL OF THAT PORTON OF THE SRE.THETHE AB. <br /> PROJECT HAS UNDERGONEFN,STADUZATDN.AND AN NOT HAS BEEN SUBMITTED TO <br /> SWPPPCAry BE KEPI INEiHEq THE FIELD OFFICE OR INAN ONSITE VEHICLE DURING NORMAL A, ALL INFILTRATION AREAS MUST BENSPECTEO TO ENSURE THAT NO SEDIMENT FROM <br /> WORKINGXQURS ONGOING CONSTRUTION ACTMTY IS REACHING THE INTILTRAOCN AREA ALL <br /> ALL OWNER(S)MUST KEEP THE PouovnNG SECURESa+FLE FOR THREE(]IVEARU LITER <br /> INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT EQUIPMENT IS NOT BEING I -YIAa _ ,w -:F..... <br /> i ..... Be. Fon Pate. <br /> DRIVEN ACROSS THE INFILTRATION AREA .a .1-......t....4 ,rt r�A C� _ <br /> AFTER SUBMITTAL <br /> UB ITT L NOT AS NOT. <br /> VIED N PMT c.THIS DOES NOT INCLUDE ANY RECORDS <br /> AFTER SUBM TIAL OF THE NOT �^� ��a', -__..._ � <br /> POLLUTION PREVENTION MANAGEMENT IV.F _..--_ __- _ _- <br /> .aa _ua.r am+ <br /> 1. THE FINAL SWPPP THE PERM-PENS)SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT :TRY----------T a°`�a'° �M <br /> 2. ANY OTHER STORMWATEa RELATED PERMITS REQUIRED FOR THE PROJECT MEASURES ON THE SITE: s ��° 1° °� <br /> ALL SOLID WASTE(COLLECTED SEDIMENT,ASPHALT AND CONCRETE FLOATING DEBRIS, ups <br /> 3. RECORDS OF ALL WSPECTON AND MAINTENANCE CONDUCTED DURING CONSTRUCTION 1- FLASTC CONSTRUCTION DEMOL ION.WOOMER wASTESI MUST BE DISPOSED <br /> w, �""'"' '°"'°^o re ”Fs <br /> (PART IVE.NSPECTONS AND MAINTENANCE) <br /> PAPER <br /> A, ALL PERMANENTOPERATONANDM,NTENANCEAGREEMENTSTHATHAVEBEEN DFPaDPER NDQUMPLYW HM AD PD LREG REQUIREMENTS. .�..A_a.._ SWPPP <br /> S(DLGASOLE.P E51 <br /> MUST BE PROPERLY STORED TO PREVENT SPILL,LEAKS OR OTHER DISCHARGE. <br /> BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCEOFTETEMPDR TEMPORARY AND PERMANENT IMPLEMENTED,INCLUDING ALL RIGHT-0E4VA,CONTRACTS.COVENANTS AND RRESTRICTED ACCESS TO STORAGE MUST BE PROVIDED TO RPEVENT Narrative and <br /> LLRMWATEDCANAGEMENTSFORDESTEMS. POSALOFXAZARDDUB WASTE MUST BEWCOMPLIANCENITHMRCAANO Notes <br /> STO ] PERMITTEE(S)MUST PROVIDE EFFECTIVE <br /> il'i <br /> CONTMNMENT FOR ALL LIQUID AND SOLID W.TES GENERATED BY WASHOUT <br /> OPERATIONS.THE LIQUID AND SOLID WASHOUT WASTES MUST NOT OMTACT THE <br /> GROUND,AND THE CONTAINMENT MUST BE DESIGNE0 SO TIAT Tr DOES NOT RESULT IN ••=m4m1 <br /> RUNOFF FROM THE WASHOUT OPERATIONS AREA L.I0 AND SOLID W.TES MUST BE P.B. <br /> =` WASTES PRDPERFALILITEBFDRDIBPDBALDFLDERETEANDDTERWASHOUT P-5 <br />