<br /> GENERAL SWEPT REQUIREMENTS&NOTES: PART IV CONSTRUCTION ACTIVITY REQUIREMENTS FINAL STABILIZATION-PART IV.G Rya
<br /> IDENTIFIEDTHE CONTRACTOR AND ALL SUBCONTRACTORS INVOLvED WITH A CONSTRUC7101/THAT DISTURBS SITE SOIL OR WHO IMPLEMENT INngineering
<br /> TIVITY THE PERMITEE MUST IMPLEMENT THE SWPPP AND THE REQUIREMENTS OF THIS PART.THE THE CONTRACTOR MUST ENSURE FINAL ST.ILIZATION OF THE SITE ACCORDING WITH THE
<br /> THE STORM WATER POLLUT.N PREVENTION AAA((SWPPP,MUST COMPLY WITH WWITHHTXON(NOT GENERAL w DAYS AAFTER N.G.rwu s.BILIZATONi IS MUST oR LANOOe,LIOP,,i TIE: Ris7 s
<br /> REQUIREMENTS OF THE NATIONAL POLLUTION TEM NPGES) RELEVANT MANUFACTURER SPECIFICATIONS AND ACCEPTED ENGINEERING PRACTICES. WITHIN 7 DAYS AFTER SELLING THE SITE OR PORTION OF NE SITE TO ANOTHER PARTY A
<br /> AGENCYGENERAL PERMIT DATED AUGUST 1,2013AL COPY OF THIS NOT/PERMIT MODIFICATION FORM MUST GO TO THE NEW OWNER THE
<br /> GOVERNING HAVING JURISDICTION CONCERPAINR NING EROSIAGES ON AND SEOIMAND ANY EBTATOS EROSION PREVENTION PRACTICES-PART IV.B ER THAT
<br /> fl655W.M 53I
<br /> CONTROL, sPECI
<br /> I RTEE(SI MUST PLAN FOR AND IMPLEMENT APPROPRIATE BMPS SUCSPECIFICALLY ADDRESS ANY REMAINING CONSTRUCTION ACTIVITY. Excelebr,MWater-
<br /> 55331
<br /> H AS
<br /> CONSTRUCTION PHASING.1..EGETATVE BUFFER STRIPS.HORL2ONTAL SLOPE GRADING. (952)221-3700
<br /> INSPECTION ANO MAINTENANCE OF PART IV.E AND OTHER CONSTRUCTION PRACT.S
<br /> THAT MINIMIZE EROSION AS NECESSARY TO COMPLY WITH THIS PERMIT AND PROTECT
<br /> CONSTRUCTION ACTIVITY INFORMATION:
<br /> DELINEATED LEGS WITH FLLAGSSTAKES.TSIGNS,SILT FENCE ETC.)ON THE PROJECT SWPPP CONTACTS:
<br /> PROJECT NAME:EISINGER Furs SITE BEFORE WORK BEGINS L.'''.""'B.
<br /> PROJECT TYPE:MULTI FAMILY RESIDENTAL PROJECT LOCATION 3245 WAYZATA BOULEVARD,ORONO,MN 55558 3EROSION,BUT NO LATER THAN END OF THE NEXT WORK TAY WHEN EARTHWORM
<br /> lR TOR awan.✓e e.r
<br /> CUMLILATVE IMPERVIOUS5uRFACE TSSENAME
<br /> ACTIVITIES WILL CEASE FOR AT LE.7 14 DAYS. NGUCRtE.w AGGPEGATEY STOCKPILES ADDRESS
<br /> TOTAL SITE ACRES 23.18 ACRES STOCKPILES,DEMOLITION CONCRETE STOCKPRES. TNO
<br /> STOCKPILES,
<br /> SMIIAR SUR CONTACT IP ONE
<br /> FACES N H 4+•
<br /> NUMBER OF ACRES TO BE DISTURBED 72 ACRES CONSTRUCTED BASE COMPONENTS OF OS,PARKING LOTS AND 51
<br /> POST-CONSTRUCTION ACRES OF IMPERVIOUS SURFACE 3 s*TTEE(SI MUST SPRE-CONSTRUCTION ACRES OF IMPERVIOUS SURFACE 0.0 ACRES ARE EXEMPT FROM THIS TABILIZE ���°
<br /> E NORMAL WETTED PERIMETER OF ANY N
<br /> TOTAL NEW IMPERVIOUS SURFACE ARA 553 ACRES TEMPOARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROMoNNEg,
<br /> ANY PORTON OF THE CONSTRUCTION SITE,OR DIVERTS WATER.OUND THE SITE.
<br /> LAKE WEST DEVELOPMENT
<br /> RECEIVING WATERS
<br /> 111-1IN 200 LINE,FEET FROM THE
<br /> GE,OR FR01.4 A PONT OF
<br /> LAKE PROPERTY
<br /> AMN 55345 SPECIALO TTIMPAIRED wAER. TO A ,FEET FTER TBE EISINGERMINNETDNNAME OF WATER NO YES COMPLETED SURFACE WATER. LGNNGTDABDRFLLZATION OF THE L.T 200 EwAER.
<br /> DATES OF CONSTRUCTION SEDIMENT CONTROL PRACTICES-PART IV.0 CONTACT PEERS BOWL 95.2-65.3-1359 FLATS
<br /> ESTIMATED COMPLETOFJ. 7,,/JIIM20 t TTEE(51 MUST EMPLOY SEDIMENT CONTROL PRACTICES AS NECESSARY TO
<br /> MINIMIZE SEDIMENT FROM ENTERING FACE WATERS,INCLUDING CURB AND GUTTERSYSTEMS AND STORM SEWER WLETS. SOIL INFORMATION Oros,MN
<br /> 2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON,L DOWN GRADIENT
<br /> THE PERIME
<br /> PART III STORMWATER DISCHARGE DESIGN REQUIREMENTSPERIMETERS AND BE LOCATED UPGRADIENT OF ANY BUFFER TER for
<br /> SEDIMENT CONTROL PRACTICES MU.BE IN PLACE BEFORE ANY UPGRADIENT
<br /> LANGgM
<br /> STURBNG ACTTES BEGIN. N
<br /> THESE PRACTICES SHALL REMNN PLACE UNTIL
<br /> SWPPP IMPLEMENTATION RESPorvSIB LrtIES
<br /> t. THE OWNER AND CONTRACTOR ARE CO..MIMES AS DENTFIED BY THE NPDES PERMIT FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WRXPMT N.G. ..
<br /> 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON SITE IMPLEMENTATION OF THE S BEEPERMITTEE(S)
<br /> ADJUSTEDSOR REMOVED TO ACCOMODATENSHORRTT.TTERMAPRACTICES
<br /> T SS AOT AsvE LAIKEWEbT,LLC
<br /> 3. THE CONTRACTOR SHALL PROVIDE PERSON KNOWLEDGEABLE At.EXPERIENCE0 IN TIE SHORT-TERA4 ACTIVITY HAS BEEN COMPLETED.
<br /> APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL MPS AND OVERSEE
<br /> . TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT
<br /> ALL INSTALLATION ANLI MAINTENANCE ANNOT BE PLACED IN ANY NATURAL BUFFERS OR SURFACE WATERS.
<br /> 4. THE CONTRACTOR SH,L PROVIDE ON,S)MEETING THETA TRTATON AINING REQUIREMENTS SWPPP CLEARING OR GRUBBING.OR P.SAGE OF VEHICLES.IMMECIATELY AFTER THE
<br /> • AND CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS.OR
<br /> OF THE NRDES PERMIT TO CONDUCT INSPECTON AND MAINTENANCE OF,L EROSION CONDUITS AND DRONES.
<br /> PREVENTION AND SEDIMENT CONTROL BMPS IN ACCORDANCE NITH THE NTss ITTEENT)MUS INSTALL A VEHICLE TRACKING BNP TO MINwI3F THE TRACKOF THE PERMIT.ONE OF THESE INDPMUALS MUST BE AVAILABLE FOR AN ONSITE ,77717,AD
<br /> asauL •
<br /> OUT R
<br /> OFSEDIMENT FROM THE CONSTRUCTON SITE. . .xm
<br /> Sr* ..
<br /> INSPECT.N WITHIN 72 HOURS UPON REMEST BY MP..THE CONTRACTOPROVIDE TRAINING AND DOCUMENTATION OF PERSONNEL TO INCLUDE,
<br /> AIPERSONNEL ASSOCIATED WPM THE PROJECT THAT ARE REQUIRED TO BE INSPECTIONS AND MAINTENANCE-PART IV,E a°^
<br /> M
<br /> 42 TRAINING NAME OF AND ENTITY THAT PROVIDED t nTE15�MUST ENSURE THAT A TRMNE D PERSON WILL ROUTINELY INSPECT TRAINED , °'`,. a"'°^T M
<br /> DATES OF TRA THE PERM CONSTRUCTION SITE AT LEAST ONCE EVERY SEE
<br /> N 71 DAYS DURING ACTIVE •
<br /> THAN oS T
<br /> HN.H RAR NFA NT J a•N
<br /> TM N NG THE ENTRE
<br /> 4.3. CONTENT OF RNNWC TIONA INCLUDING OF OF COVERAGE
<br /> SOF FOR THE CONSTRUCT.ARS WTI 3 OURS AFTER RAINFALL EVE WO*
<br /> S FOLLOWING FINAL STABILMATION ANDTERMINATION OF COVERAGE FOR THE PERMIT,THE INCHES NNHOURS. �"'- ....... Rte,
<br /> OWNER SHALL FURNISH LONG TERM OPERATION AND MAINTENANCE OF THE PERMANENT 2 ,L INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTON MUS BE ..
<br /> HIM tr.^Wmr
<br /> STORM WATER MANAGEMENT SYSTEM RECORDED WITHIN 24 HOURS IN WRITING AND T1ESE RECORDS MUST BE RETAINS➢WITH
<br /> THE SWPPP IN ACCORDANCE WITH PART III.E.
<br /> RECORDS RETENTION-PART ILLS 3. THE PERMRTEE(SH.RE RESPONSIBLE FOR THE INSPECTION AND MMNTEANCE OF
<br /> TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BAPS,AS WELL AS ALL I
<br /> EROSION PREVENTION AND SEDIMENT CONTROL BMPSNTL ANOTHER PERMITTEE HAS
<br /> THE SWPPP(ORIGINAL OR COPIES)INCLUDINGALL CHANGES TO R,AND INSPECTIONS AND m
<br /> MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE OBTAINED COVERAGE UNDERTHIS PERMIT NACCCRDANCE WITH PART 11.0.13 OR THE
<br /> PERMITTEE(SI WHO HASmAVi OPERATIONAL CONTROL OF THAT PORTON OF THE SRE.THETHE AB.
<br /> PROJECT HAS UNDERGONEFN,STADUZATDN.AND AN NOT HAS BEEN SUBMITTED TO
<br /> SWPPPCAry BE KEPI INEiHEq THE FIELD OFFICE OR INAN ONSITE VEHICLE DURING NORMAL A, ALL INFILTRATION AREAS MUST BENSPECTEO TO ENSURE THAT NO SEDIMENT FROM
<br /> WORKINGXQURS ONGOING CONSTRUTION ACTMTY IS REACHING THE INTILTRAOCN AREA ALL
<br /> ALL OWNER(S)MUST KEEP THE PouovnNG SECURESa+FLE FOR THREE(]IVEARU LITER
<br /> INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT EQUIPMENT IS NOT BEING I -YIAa _ ,w -:F.....
<br /> i ..... Be. Fon Pate.
<br /> DRIVEN ACROSS THE INFILTRATION AREA .a .1-......t....4 ,rt r�A C� _
<br /> AFTER SUBMITTAL
<br /> UB ITT L NOT AS NOT.
<br /> VIED N PMT c.THIS DOES NOT INCLUDE ANY RECORDS
<br /> AFTER SUBM TIAL OF THE NOT �^� ��a', -__..._ �
<br /> POLLUTION PREVENTION MANAGEMENT IV.F _..--_ __- _ _-
<br /> .aa _ua.r am+
<br /> 1. THE FINAL SWPPP THE PERM-PENS)SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT :TRY----------T a°`�a'° �M
<br /> 2. ANY OTHER STORMWATEa RELATED PERMITS REQUIRED FOR THE PROJECT MEASURES ON THE SITE: s ��° 1° °�
<br /> ALL SOLID WASTE(COLLECTED SEDIMENT,ASPHALT AND CONCRETE FLOATING DEBRIS, ups
<br /> 3. RECORDS OF ALL WSPECTON AND MAINTENANCE CONDUCTED DURING CONSTRUCTION 1- FLASTC CONSTRUCTION DEMOL ION.WOOMER wASTESI MUST BE DISPOSED
<br /> w, �""'"' '°"'°^o re ”Fs
<br /> (PART IVE.NSPECTONS AND MAINTENANCE)
<br /> PAPER
<br /> A, ALL PERMANENTOPERATONANDM,NTENANCEAGREEMENTSTHATHAVEBEEN DFPaDPER NDQUMPLYW HM AD PD LREG REQUIREMENTS. .�..A_a.._ SWPPP
<br /> S(DLGASOLE.P E51
<br /> MUST BE PROPERLY STORED TO PREVENT SPILL,LEAKS OR OTHER DISCHARGE.
<br /> BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCEOFTETEMPDR TEMPORARY AND PERMANENT IMPLEMENTED,INCLUDING ALL RIGHT-0E4VA,CONTRACTS.COVENANTS AND RRESTRICTED ACCESS TO STORAGE MUST BE PROVIDED TO RPEVENT Narrative and
<br /> LLRMWATEDCANAGEMENTSFORDESTEMS. POSALOFXAZARDDUB WASTE MUST BEWCOMPLIANCENITHMRCAANO Notes
<br /> STO ] PERMITTEE(S)MUST PROVIDE EFFECTIVE
<br /> il'i
<br /> CONTMNMENT FOR ALL LIQUID AND SOLID W.TES GENERATED BY WASHOUT
<br /> OPERATIONS.THE LIQUID AND SOLID WASHOUT WASTES MUST NOT OMTACT THE
<br /> GROUND,AND THE CONTAINMENT MUST BE DESIGNE0 SO TIAT Tr DOES NOT RESULT IN ••=m4m1
<br /> RUNOFF FROM THE WASHOUT OPERATIONS AREA L.I0 AND SOLID W.TES MUST BE P.B.
<br /> =` WASTES PRDPERFALILITEBFDRDIBPDBALDFLDERETEANDDTERWASHOUT P-5