My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE#LA19-000022 <br /> April 15,2019 <br /> Page 2 of 4 <br /> LOT ANALYSIS WORKSHEET <br /> Section 78-305—LR-1A Lot Area/Width: <br /> In the LR-1A zoning district, all lots must include a minimum of 2 acres of dry-buildable area, <br /> and 200 feet of width. <br /> Gross Dry Non- Lot Width At <br /> Area Buildable buildable (At BSL) OHWL 75 <br /> • <br /> 206 (At <br /> Lot 1 2.04 2.04 Brown Rd) <br /> Lot 2 5.41 4.16 1.25 533 <br /> Lot 3 3.08 2.08 1.00 170 <br /> Lot 4 3.53 3.45 0.08 202 224 <br /> Lot 5 2.33 2.01 0.32 206 220 <br /> Lot 6 3.88 3.05 0.83 185 205 <br /> Lot 7 2.46 2.41 0.05 428 <br /> Items in Bold are non-conforming,but supported by the City Council. <br /> Section 78-1403-Structural Coverage <br /> All lots being greater than 2.0 acres will be exempt from the structural coverage limitation. <br /> Section 78-1680 and 78-1700-Hardcover Calculations (Stormwater Quality Overlay <br /> District) <br /> The subject parcel is in Tier 1, due to its proximity to Long Lake and the tributary. Upon <br /> subdivision, each lot will be assigned a Tier. These assignments have not been completed. It is <br /> anticipated that lots 1-6 will be Tier 1 (25%)and lot 7 may be Tier 2 (30%). Tier assignments <br /> will be made as part of the final plat. <br /> Analysis <br /> Comprehensive Plan. The proposal is consistent with the Comprehensive Plan, including in use <br /> and density. <br /> Streets. The developer proposes the construction of a single, new private road that will terminate <br /> in a cul de sac. The length of the road is 1000 feet,meeting the maximum length requirement. This <br /> road will provide vehicular access for all lots. Covenants will be necessary to restrict access onto <br /> Brown road for lots 1, 6, and 7. The city engineer is reviewing the street details and will provide <br /> comment,to be incorporated into the final construction plans. <br /> Utilities. All 7 lots will be served by municipal water and sewer. Water is in Brown Road ROW, <br /> and will be used to serve a new main to be located within the new road, and will terminate in a <br /> hydrant at the end of the cul de sac. A second hydrant is proposed at the property line between lots <br /> 6 and 7. The Fire Chief has recommended a third additional hydrant at the entrance to the <br /> neighborhood. <br /> Sanitary sewer will be collected and channeled to a new lift station within lot 1. Staff <br /> recommends that in lieu of a liftstation for these 6 lots,the sanitary sewer should be a low pressure <br />
The URL can be used to link to this page
Your browser does not support the video tag.