My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05486 - septic
Orono
>
Property Files
>
Street Address
>
S
>
Sussex Road
>
3160 Sussex Road - 04-117-23-32-0008
>
Septic
>
2002-P05486 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:11:49 PM
Creation date
4/10/2019 12:03:56 PM
Metadata
Fields
Template:
x Address Old
House Number
3160
Street Name
Sussex
Street Type
Road
Address
3160 Sussex Rd
Document Type
Septic
PIN
0411723320008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' <br /> CITY OF ORONO SEPTIC SYSTEM PERNIIT APPLICATION <br /> Boz 66(2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> JOB SITE ADDRESS � �� �`��!� <br /> Occupancy Type: Residential Commercial Other <br /> Permit Type: New ,r Replacement System $100.00 <br /> epair Eaisting System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee sohedule for non-residential permit fees <br /> Owner's Name: D`7 �lE�—o1/ Phone Number: �� �9$ �?!� <br /> Mailing Address: �S'C� City: � Zip: �'� <br /> Contractor's Name: Phone Number: p,s-a a33 �5� <br /> Mailing Address: ,�/��l' �.�nJ� City_���c!� Zip:`s�3�—a?9 T <br /> *** DO NOT MAII,PAYMENT`VITH THIS APPLICATION'�** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit cazd is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A Pre-installation site inspection to include inspector, installer, and general contractor. <br /> � B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> �, rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump sta.tions <br /> (where required) components aze functional and comply with codes. <br /> 5. Individual holding MPCA Installers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.